Charles, Joseph

Report Number Author(s) Title Abstract Summary County Year
1869 Smith, Caleb, Charles, Joseph Archaeological Survey of the Proposed State Route 24 Widening and Improvement Corridor

From 28 September to 2 October 1998, Brockington and Associates, Inc. conducted an archaeological survey of a proposed 14 kilometer (8.7 mile) long and approximately 80 meter (240 foot) wide improvement corridor along State Route 24 (SR 24) in Putnam County, Georgia.

Putnam County, GA 1999
1969 Southerlin, Bobby G., Charles, Joseph Archaeological Survey of the Industrial Park Way Corridor, Barrow County, Georgia

On 14 May 1999, Brockington and Associates, Inc. conducted an intensive archaeological survey of the proposed Industrial Park Way corridor. Project goals included location and evaluation of any archaeological resources in the project corridor, and the development of management recommendations.

Barrow County, GA 1999
2088 Charles, Joseph Archaeological Survey of the Proposed Raccoon Creek Substation, Mitchell County, Georgia

From 2-12 January 2001, Brockington and Associates, Inc., conducted an archaeological resources survey for a proposed electrical substation adjacent to Raccoon Creek, just outside of Baconton in Mitchell County.

Mitchell County, GA 2001
2092 Charles, Joseph Cultural Resource Survey of the Proposed Lakeside Substation, Hall County, Georgia

From 22-23 February 2000, Brockington and Associates, Inc. conducted a cultural resource survey for a proposed substation for an industrial park outside of Oakwood, Georgia in Hall County.

Hall County, GA 2001
2112 Charles, Joseph Archaeological Survey of the Whittlesey Road Improvement Corridor

On 15 December 2000, Brockington and Associates, Inc. conducted an archaeological resources survey for proposed improvements along Whittlesey Road in Columbus, Georgia. The project corridor, which extends from Whitesville Road east to Veteran's Parkway, is approximately 1.28 km (0.8 mi).

Muscogee County, GA 2003
2199 Charles, Joseph Cultural Resources Survey of the Proposed Wallace Combined Cycle Turbine Tract Greene County, Georgia

On 13 and 14 March 2001, Brockington and Associates, Inc., conducted a cultural resources survey on a 56 hectare (138 acre) tract for a proposed combined cycle turbine to be located near the Double Creek region of Lake Oconee in Greene County, Georgia.

Greene County, GA 2001
2278 Charles, Joseph Phase II Archaeological Investigations Along the Vogtle-Effingham-Thalman 500 kV Transmission Line, Burke and Liberty Counties, Georga

From 21 to 31 May 2001, Brockington and Associates, Inc., conducted Phase II archaeological testing at five sites in Burke and Liberty counties, Georgia.

Burke County, GA 2003
2278 Charles, Joseph Phase II Archaeological Investigations Along the Vogtle-Effingham-Thalman 500 KV Transmission Line, Burke and Liberty Counties, Georgia

From 21-31 May 2001, Brockington and Associates, Inc., conducted Phase 11 archaeological testing at five (9BK72-75; 9LI30 1) sites along the Vogtle-Effingham-Thalman 500 KV transmission line in Burke and Liberty counties, Georgia (Table 1).

Burke County, GA 2003
2400 Charles, Joseph Archaeological Survey of Four Intersections in Macon County, Georgia Project #STP-00MS(384)

On 1 October 2002, Brockington and Associates, Inc. conducted an archaeological resources survey of four proposed intersection improvements located in Macon County, Georgia.

Macon County, GA 2002
2425 Charles, Joseph Phase I Archaeological Survey at Proposed Bridge Replacement BRST-0532(12), State Route 41 Over Kinchafoonee Creek, Webster County, Georgia

On 2 October 2002, Brockington and Associates, Inc. conducted a Phase I archaeological survey for a proposed bridge replacement in Webster County, Georgia (GDOT Project # BRST0532[ 12]).

Webster County, GA 2002
Displaying 1 - 10 of 23