Report Number Author(s) Title Abstract Summary County Year
9265 Heller, Nathanael, Boyko, Wayne C., Eberwine, James Phase I Cultural Resources Survey of the Georgia Portion of the Once Proposed Kinder Morgan Palmetto Pipe Line Project, Burke, Jenkins, Screven, Effingham, Chatham, Bryan, Liberty, Long, Mcintosh, Glynn, Camdenm, and Charlton Counties, Georgia

This report describes the results of Phase I cultural resources survey conducted for the Georgia portion of the once-proposed Kinder Morgan Palmetto Pipe Line Project, in Burke, Jenkins, Screven, Effingham, Chatham, Bryan, Liberty, Long, McIntosh, Glynn, Camden, and Charlton counties, Georgia.

Bryan 2016
9378 Eberwine, James Additional Phase I Cultural Resource Investigations of Variances Associated with the Elba Express Pipeline Project (HP-060217-004), Effingham and Screven Counties, Georiga

This letter presents the results of additional Phase I cultural resources investigations completed as part of the proposed Elba Express Pipeline Project; this undertaking currently is under review by the Federal Energy Regulatory Commission (FERC).

Effingham 2009
9749 Eberwine, James Addendum to Phase I Cultural Resources Survey of the Proposed Elba Coldwater Compressor Station Project, Elbert County, Georgia

This addendum report presents the results of additional Phase I cultural resources investigations completed as part of the proposed Elba Coldwater Compressor Station Project; this undertaking currently is under review by the Federal Energy Regulatory Commission (FERC).

Elbert 2012
9750 Eberwine, James Addendum to Additional Phase I Cultural Resources Investigations of the Elba Liquefaction Project at Elba Island in Chatham County, Georgia

The Companies plan to add natural gas liquefaction and exporting capabilities to their existing Elba Island liquefied natural gas (LNG) terminal in Chatham County, Georgia (Terminal) in order to export domestically-sourced LNG.

Chatham 2014
9844 Eberwine, James Addendum #4 To Phase I Cultural Resources Survey of the Proposed Elba Coldwater Compressor Station Project, Elbert County, Georgia for the Proposed Elba Express Company LLC Modification Project, HP-060217-004

This addendum report describes the results of the additional Phase I cultural resources investigations completed as part of the proposed Elba Express Company, L.L.C.

Hart 2017
14405 Eberwine, James, Stitcher, David Addendum Report: Phase I Cultural Resources Survey of an Access Road Associated with the Southern Natural Gas Mid-State Energy Access Road Project

The survey area measured approximately 250 x 10 m in size and it extended north from Loraine Forest Road to the proposed Mid-South Meter Station. The proposed access road was in a wooded area west of an existing pipeline corridor.

Monroe 2021
14437 Eberwine, James, Stitcher, David Phase I Cultural Resources Survey of the Southern Natural Gas/Magnolia Hazlehurst Delivery Project

The project entails the construction of a meter station interconnect facility in conjunction with Magnolia and Atlanta Gas and Light, Co. (AGLC).

Jeff Davis 2021
Displaying 11 - 17 of 17