Report Number Author(s) Title Abstract Summary County Year
10588 Erickson, Luke W. Archaeological Assessment of a Crisp County Resurfacing Project

This proposed project would improve the SR 33 Connector by resurfacing the roadway, beginning at the intersection with SR 33 and ending at M.P. 1.95. Earth shoulders will be reconstructed from a maximum distance of 4' from the edge of new pavement.

Crisp County, GA 2005
10596 Erickson, Luke W. Archaeological Assessment of a Dooly/Macon County Resurfacing Project

The proposed project consists of the resurfacing and patching of SR 329 beginning 59' east of its intersection of SR 26 in Macon County and ending 50 ' west of its intersection with SR 230 in Dooly County.

Dooly County, GA 2006
10603 Erickson, Luke W. Archaeological Assessment of a Calhoun County Road Safety Project

This project proposes to install new road striping and warning signs at four locations within Calhoun County. All work will take place within the existing right-of-way with no new right-of-way required. Total project length of the four locations is approximately 13 miles.

Calhoun County, GA 2005
10604 Erickson, Luke W. Archaeological Assessment of a Polk County Resurfacing Project

This project proposes the milling, inlay, and striping of SR 1 Business beginning at US 27 and ending at Vance Avenue. All work will take place within the existing right-of-way with no new 1ight-of-way required. Total project length is approximately 2.22 miles.

Polk County, GA 2006
10606 Erickson, Luke W. Archaeological Assessment of a Jackson County Resurfacing Project

This project is 3.8 miles in length and consists of resurfacing on SR 11 Business beginning at its intersection with SR 82 and ending at the Jefferson Bypass. Raised Pavement markers and patching will be handled by the contractor. No additional right-of-way is required.

Jackson County, GA 2004
10607 Erickson, Luke W. Archaeological Assessment of the Habersham County Resurfacing Project

This proposed project is 3.490 miles in length and consists of leveling, patching, and resurfacing on SR 197 beginning south of SR 15 and ending at SR 17. Raised pavement markers, patching and shoulder building will be handled by the contractor. No additional right-of-way is required.

Habersham County, GA 2004
10615 Erickson, Luke W. Archaeological Assessment of a Cobb County Resurfacing Project

This proposed project consists of the milling, inlay, and resurfacing of SR 5 beginning at the Cobb/Douglas County Line and ending at Austell Road. All work will take place within the existing right-of-way with no new right-of-way be required.

Cobb County, GA 2006
10618 Erickson, Luke W. Archaeological Reassessment of Project BRS-0854(10), Fannin County

"In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project BRS-0854(10), Fannin County, has been surveyed with respect to archeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP

Fannin County, GA 2003
10632 Erickson, Luke W. Archaeological Assessment of a Charlton County Bridge Project

This project proposes to strengthen the intermediate bent caps on the bridge over the CSX Railroad, on SR 4, two miles north of the City of Folkston, Charlton County, Georgia.

Charlton County, GA 2005
10635 Erickson, Luke W. Archaeological Assessment of a Bryan County Interstate Lighting Project

This project consists of installing 6 high mast towers with 6 luminary poles at the I-95 and SR 144 intersection in Bryan County. All work will take place within the existing right-of-way, with no new right-of-way required.

Bryan County, GA 2005
Displaying 231 - 240 of 504