10649
|
Erickson, Luke W.
|
Archaeological Assessment of a Coffee County Safety Improvement Project
|
This proposed project consists of the installation of striping, raised pavement markings and warning signs at the following locations. All work will take place within the existing right-of-way with no new right-of-way required.
|
Coffee
|
2005
|
10650
|
Erickson, Luke W.
|
Archaeological Assessment of the Elbert County Resurfacing Project
|
The proposed project would consist of resurfacing, milling, shoulder building, rumble strips, and striping activities on SR 101 in Paulding and Polk Counties, Georgia.
|
Elbert
|
2003
|
10652
|
Erickson, Luke W.
|
Archaeological Assessment of Project SR 284, Hall County
|
This project involves spot patching, leveling, resurfacing, and shoulder building on SR 284 beginning at SR 11 Business and extending to Clarke Bridge over Lake Lanier. All work will be performed within the existing right-of-way. No additional right-of-way will be required.
|
Hall
|
2003
|
10653
|
Erickson, Luke W.
|
Archaeological Assessment of the Hall County Resurfacing Project
|
This proposed project is 1.25 miles in length and consists of milling, resurfacing, and patching of SR 11 beginning at Monroe Drive (MP 7.6) and ending at SR 11 Business (ML 8.9) No additional right-of-way is required.
|
Hall
|
2003
|
10654
|
Erickson, Luke W.
|
Archaeological Assessment of the Dawson County Resurfacing Project
|
This proposed project is 10.5 miles in length and consists of milling, inlay and widening of SR 183 beginning at SR 53 (MP 0.0) and ending at SR 52 (MP 10.5). No additional right-of-way is required.
|
Dawson
|
2003
|
10655
|
Erickson, Luke W.
|
Archaeological Assessment of the Jackson, Banks, Franklin Counties Resurfacing Project
|
This project is 11.68 miles in length and consists of leveling, patching, resurfacing, shoulder building, and permanent striping of SR 59 beginning at the intersection of SR 15 (MP 0.00) in Jackson County and ending at the intersection of SR 51 at MP 4.64.
|
Banks
|
2003
|
10656
|
Erickson, Luke W.
|
Archaeological Assessment of the Banks County Resurfacing Project
|
This project is 6.2 miles in length and consists of leveling, patching, and resurfacing of SR 98 beginning at the SR 15 (MP 0.00) and ending at SR 52 (MP 6.2). No additional right-of-way is required.
|
Banks
|
2003
|
10660
|
Erickson, Luke W.
|
Archaeological Assessment of a Paulding County Resurfacing Project
|
This proposed project is 9.65 miles in length and consists of leveling, resurfacing, and earth-shoulder rebuilding on SR 120 beginning at SR 101 (M.P. 3.46) and ending at SR 6 (M.P. 13.11) in Paulding County, Georgia.
|
Paulding
|
2005
|
10662
|
Erickson, Luke W.
|
Archaeological Assessment of a Paulding County Resurfacing Project
|
This proposed project is 7.026 miles in length and consists of resurfacing, milling, and grading on SR 61 beginning at MP 0.00 and ending at MP 7.024 westbound and MP 7.026 eastbound. Additionally, 4' earthen shoulders will be reconstructed along the project length.
|
Paulding
|
2004
|
10666
|
Erickson, Luke W.
|
Archaeological Assessment of a Franklin County Resurfacing Project
|
This project includes 9.052 miles of leveling and resurfacing on SR 106, beginning at the Madison/Franklin County Line and ending at SR 59. No additional right-of-way is required. 9.052 miles of leveling with 4.75 mm asphalt concrete, resurface with 12.5 mm superpave.
|
Franklin
|
2004
|