Back to top

Pietak, Lynn Marie

Report Number Author(s) Title Abstract Summary County Year
3888 Pietak, Lynn Marie Phase I Archaeological Survey of Proposed Intersection Improvements at Gee's Mill Road and Sigman Road, Rockdale County, Georgia

Project MSL-0004-00(650), Rockdale County, P.I. Number 0004650 would construct intersection improvements at Sigman Road and Gees Mill Road, located approximately 1.4 miles north of Interstate 20 in Conyers, Georgia.

Rockdale 2007
3890 Pietak, Lynn Marie Addendum to Archaeological Survey for the Proposed Bridge Replacement at SR 85A over CSX Transportation Railroad, Meriwether County, Georgia

This is an addendum to archeological survey for the proposed bridge replacement at SR 85A over CSX Transportation Railroad, Meriwether County, Georgia.

Meriwether 2007
3905 Pietak, Lynn Marie Phase I Archaeological Survey of Proposed Improvements to Sr 105/US 441 Business Route, Habersham County, Georgia

The proposed project is located along SR 105 beginning at the Cannon Bridge Road intersection approximately one mile west of the existing interchange at SR 365, near the city of Cornelia, in Habersham County.

Habersham 2007
3907 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of the West End Historic District Livable Center Initiative, Fulton County, Georgia

This addendum includes the results of the archaeological survey for project STP-0004-00 (463) [see attachment for current project description and explanation of project changes]; the area of potential effect includes a new segment of Lowery Boulevard south of 1-20.

Fulton 2007
3911 Pietak, Lynn Marie, Quirk, Phillip W. Phase I Archaeological Survey of the State Route 191 Over Scull Shoal Creek Bridge Replacement, Madison County, Georgia

During November 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the State Route (SR) 191 over Scull Shoal Creek Bridge Replacement.

Madison 2007
3913 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Gordon County Signal Design Upgrades Project Areas

Original: The proposed project would consist of traffic signal upgrades at 12 intersections in Gordon County, Georgia.

Gordon 2007
3915 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Murray County Signal Design Upgrades Project Areas

Original: The proposed project would consist of traffic signal upgrades at seven intersections in Murray County, Georgia.

Murray 2007
3920 Pietak, Lynn Marie, Quirk, Phillip W. Phase I Archaeological Survey of the Proposed Bright Star Road Park and Ride Project Area, Douglas County, Georgia

In February 2007, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed Bright Star Road Park and Ride project area. The proposed project consists of constructing a park and ride lot facility on an 8.6-acre site located in Douglas County, Georgia.

Douglas 2007
3924 Pietak, Lynn Marie Second Addendum to the Phase I Archaeological Survey of the Omega/Eldorado Road at I-75 Interchange, Tift County, Georgia

The proposed project would reconstruct the existing interchange on Interstate 75 (1-75) and County Road (CR) 418/Omega-Eldorado Road (Exit 55) in Tift County.

Tift 2007
3925 Pietak, Lynn Marie Phase I Archaeological Survey for the Widening and Improvements to SR 306 and SR 369, Forsyth County, Georgia

This project is the widening and reconstruction of SR 306/Keith Bridge Road from the SR 400 northbound ramps to east of SR 369, including the extension of the bridge culvert at Baldridge Creek. The existing roadway consists of 2-12 foot lanes (1 in each direction) with rural shoulders.

Forsyth 2007
Displaying 241 - 250 of 537