Report Number Author(s) Title Abstract Summary County Year
4107 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 11/US129 at Pat Colwell Road & Pat Haralson Drive

The original proposed project would consist of constructing exclusive left turn lanes onto CR 100/Pat Colwell Road and CR 200/Pat Haralson Drive, with a 610-foot long two-way left turn lane.

Union 2007
4126 Silliman, Garrett W., Pietak, Lynn Marie Second Addendum to the Phase I Archaeological Survey of SR 216 Over Carter Creek, Randolph County, Georgia

During July 2007, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed replacement of the SR 216 Bridge over Carter Creek in Randolph County, Georgia.

Randolph 2007
4136 Price, George D., Pietak, Lynn Marie Phase I Archaeological Survey for the Proposed West Ringgold-Center Point 230/115-kV Transmission Line, Whitfield and Catoosa Counties, Georgia

TRC conducted a Phase I archaeological survey for this proposed West Ringgold-Center Point TVA transmission line project from July 10-21, 2000.

Catoosa 2000
4170 Pietak, Lynn Marie 2nd Addendum to Phase I Archaeological Survey of Foe Killer Creek Bridge Replacement & Associated Road Improvements Project Area

Original: The proposed project would consist of roadway improvements to Old Roswell Road/Rock Mill Road (CR 1332) from Mansell Road to Sanctuary Parkway in Fulton County.

Fulton 2007
4172 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 92 at CS 123/Collins Circle, Cobb County, GA

Original Project Description: The proposed project would add left turn lanes on SR 92 at Collins Circle. In addition, Collins Circle would be realigned to a 90 degree angle with SR 92. Adams Circle would be converted into a cul-de-sac where it intersects with SR 92.

Cobb 2007
4175 Pietak, Lynn Marie 2nd Addendum to the Phase I Archaeological Survey of Flakes Mill Road over the South River, DeKalb County

Original: The proposed project would consist of the replacement of the existing Flakes Mill Road bridge over the South River in Dekalb County approximately 1.25 miles south of the intersection of Flakes Mill Road and Flat Shoals Parkway.

DeKalb 2007
4176 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 284 over the Chattahoochee River Bridge Replacement Project Area, Hall County

Original: The proposed project would consist of replacing the bridge on SR 284 over the Chattahoochee River in Hall County. The total project length would be approximately 2,900 ft, beginning at M.P. 1.63 and extending to M.P. 2.18.

Hall 2007
4177 Pietak, Lynn Marie Third Addendum to Phase I Archaeological Survey of Houston County Signal Design Upgrades

Original: The proposed project consists of traffic signal upgrades at 19 intersections in Houston County, GA. The proposed project is designed to improve the overall efficiency and safety of traffic flow, utilizing upgraded traffic signal displays and traffic signal control equipment.

Houston 2007
4180 Pietak, Lynn Marie Addendum to an Archaeological Survey of Proposed Improvements to Flowing Wells Road, Columbia County

Original Project Description: The proposed improvements, which consist of widening the road from the existing two lanes to a four lane divided highway, begin at the I20/Wheeler Road interchange and continue north to the intersection at Washington Road (SR 104).

Columbia 2007
4181 Pietak, Lynn Marie Phase I Archaeological Survey of Nine Intersection Locations in Walker County, Georgia

The proposed project consists of traffic signal upgrades at nine intersections along SR 1 and SR 193 in Walker County.

Walker 2007