Back to top

Pietak, Lynn Marie

Report Number Author(s) Title Abstract Summary County Year
4349 Silliman, Garrett W., Pietak, Lynn Marie Addendum to the Phase I Archaeological Survey of the Proposed Noonday Creek Multi-Use Trail Project Corridor, Cobb County, Georgia

During May 2008, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed corridor for the Noonday Creek Multi-Use Trail in Cobb County, Georgia.

Cobb 2008
4361 Pietak, Lynn Marie Phase I Archaeological Survey of Intersections in Screven, Jenkins, and Dodge Counties

The proposed project consists of traffic signal upgrades at eight intersections in Screen, Jenkins and Dodge Counties.

Screven 2008
4362 Pietak, Lynn Marie Second Addendum to Phase I Archaeological Survey of Eagle's Landing Parking from Villege Center Parkway

This project proposes to continue the widening of Eagle's Landing Parkway from Village Center Parkway through the intersection with SR 42/US 23 to 700 feet east of Talon Place.

Henry 2008
4365 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Covington Hwy @ I-285 Improvements Project Area

Original: Construct an additional right turn lane on the 1-285 northbound off ramp. Add storage length to the 1-285 southbound off ramp right turn lane and the left turn lanes of both off ramps. Increase the radius of the right turn lane for the 1-285 northbound off ramp.

DeKalb 2008
4373 Pietak, Lynn Marie Second Adden. To Ph. I Arch. Survey of Glenwood Rd. @ I-285 Improvements Project Area

The proposed project would re-stripe Glenwood Road and construct a raised median on the east side of the interchange. An island would be installed at Glenfair Road to allow only right-in/rightout movements.

DeKalb 2008
4374 Pietak, Lynn Marie 2nd Adden. To Ph. I Arch. Survey of Cr 837/Sandy Flat Rd. @ Big Indian Cr., Carroll Co.

Since the time of the approved Programmatic Categorical Exclusion on October 24, 2006, several design changes have been made. Previously, the proposed project required 2.50 acres of right-of-way and no temporary or permanent easement.

Carroll 2008
4389 Pietak, Lynn Marie Phase I Archaeological Survey of Griffin Phase I Signal Upgrades, Spalding County, Georgia

The proposed project would provide new signals, upgrade and improve existing signals, and modify sidewalks in compliance with the Americans With Disabilities (ADA) Act at 17 intersections in the City of Griffin, Georgia.

Spalding 2008
4390 Pietak, Lynn Marie Phase I Archaeological Survey of Griffin Phase II Signal Upgrades, Spalding County, Georgia

The proposed project would provide new signals, upgrade and improve existing signals, and modify sidewalks in compliance with the Americans With Disabilities (ADA) Act at six intersections in the City of Griffin, Georgia.

Spalding 2008
4391 Pietak, Lynn Marie Phase I Archaeological Survey of SR 247 Connectors Improvements

Currently, the SR 247 Connector is a four-lane roadway with a raised median going from the western limits of the project, near Margie Drive to South Houston Road. Between South Houston Road and Hawkinsville Road (US 129), the existing roadway has four through lanes and a center turn lane.

Whitfield 2001
4395 Pietak, Lynn Marie Phase I Archaeological Survey of SR 127/Houston Lake Road Improvements

The proposed project would widen SR 127 (Houston Lake Road) from two lanes to three lanes by adding a continuous center left turn lane between. Turn lanes would be added at intersections where needed.

Houston 2008
Displaying 321 - 330 of 537