Back to top

Pietak, Lynn Marie

Report Number Author(s) Title Abstract Summary County Year
4494 Pietak, Lynn Marie Phase I Archaeological Survey of the Hewatt Road to Britt Drive Connector Road

The project proposes to construct a connector street from Hewatt Road to Britt Drive in order to provide access to property owners and remove commercial traffic from US 78.

Gwinnett 2009
4496 Pietak, Lynn Marie Covington Highway Widening from DeKalb Medical Parkway to Cragstone Court

The project proposes to widen Covington Highway/US 278/SR 12 from a four-lane section to a five-lane section from DeKalb Medical Parkway to Cragstone Court. The roadway would receive two through lanes in each direction and a center bi-directional left turn lane.

DeKalb 2009
4514 Pietak, Lynn Marie Glenwood Road Sidewalk Improvements From Candler Road to Covington Highway

The proposed project is located along Glenwood Road in DeKaIb County from 620 feet east of Candler Road/SR 155 (MP 3.64) to Covington Highway/US 278/SR 12 (MP 7.62).

DeKalb 2008
4515 Pietak, Lynn Marie Phase I Archaeological Survey of Lithonia to Rockbridge Trail Project Corridor, DeKalb County, Georgia

The proposed project would consist of the addition of 4.5-foot bike lanes along both sides of Main Street/North Stone Mountain Lithonia Road between Rockbridge Road and Mountain Street in the City of Stone Mountain, Georgia.

DeKalb 2008
4527 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Sandy Springs Circle Project Area, Fulton County, Georgia

Project limits have increased by approximately 267 feet (0.05 mile). The previous limits included approximately 1,762 feet along Sandy Springs Circle and 1,507 feet on Hammond Drive, for a total project length of approximately 3,269 feet (0.62 mile).

Fulton 2009
4530 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of the Sigman Rd. and East View Dr. Intersection Improvements Project

Description from December 21, 2006 PCE: The proposed project would extend approximately 480 feet north and approximately 570 feet south of the SR 20/Sigman Road and Eastview Road intersection on SR 20/Sigman Road.

Rockdale 2008
4531 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 20 and West Hightower Trail Intersection Improvements

Along State Route (SR) 20 (Loganville Highway), from approximately 725 feet south of West Hightower Trail to approximately 700 feet north of West Hightower Trail, for a total distance of approximately 0.27 miles, and along West Hightower Trail from approximately 735 feet west of SR 20 to approxim

Rockdale 2008
4538 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 98 at CR 286 Project Area

The proposed project has been revised based upon design refinements for shoulders, drainage, and driveways. New areas of right-of-way and easement have been added to the proposed project, and some areas that were previously proposed as right-of-way have been converted to permanent easement.

Jackson 2009
4540 Pietak, Lynn Marie Phase I Survey of the SR 133 Safety Improvements at 5th Avenue and Old Adel Road

The proposed will improve a total of approximately 1 mile of SR 133 from 25th Street (Colquitt County Mile Post 14.3) to Regency Village (Colquitt County Mile Post 13.6) including realigning Old Adel Road and S.E. 5th Avenue.

Colquitt 2009
4546 Pietak, Lynn Marie Addendum to Phase I Survey of the Lee Road Widening Project Area, Douglas County, Georgia

The northern limit of NHS-0001-00(917) has been extended north on Lee Road in order to better transition the interchange widening project back into Lee Road. The proposed project change would be to extend the northern limit of the project on Lee Road approximately 900 feet north of Vulcan Drive.

Douglas 2009
Displaying 341 - 350 of 537