Back to top

Pietak, Lynn Marie

Report Number Author(s) Title Abstract Summary County Year
4547 Pietak, Lynn Marie Phase I Archaeological Survey for Intersection Improvements to Walt Banks Road at North Peachtree Pky

The proposed project would consist of improvements to the intersection of CS 303/Walt Banks Road and CS 340/Peachtree Parkway in Peachtree City, Fayette County, Georgia.

Fayette 2008
4548 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of Holcomb Bridge & Alpharetta Highway

The original project limits on SR 9 were from Mansell Circle to Commerce Parkway, approximately 0.7 mile. The original limits on SR 92 were from Mansell Road Extension to Roswell Mall, approximately 0.64 mile. The total project length was 1.34 miles.

Fulton 2009
4565 Silliman, Garrett W., Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed Improvements to the Acworth Due West Road Project Corridor, Cobb County, Georgia

During May 2008, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed improvements to the Acworth Due West Road in Cobb County, Georgia.

Cobb 2009
4590 Holland, Jeffrey L., Pietak, Lynn Marie Phase I Archaeological Investigations of Off-Site Locations Associated with the Former Savannah Manufactured Gas Plant Site, Chatham County, Georgia.

During March and April of 2001, TRC Garrow Associates, Inc. (TRC), undertook a Phase I archaeological investigation of off-site locations associated with a former Manufactured Gas Plant (MGP) site in the City of Savannah, Chatham County, Georgia.

Chatham 2001
4591 Pietak, Lynn Marie Phase II Archaeological Investigation, Former Savannah Manufactured Gas Plant Site, Chatham County, Georgia

In April of 2000, TRC Garrow Associates, Inc. (TRC), undertook a Phase II archaeological investigation of the former Savannah Manufactured Gas Plant (MGP) site in Chatham County, Georgia.

Chatham 2000
4909 Pietak, Lynn Marie Phase I Survey of Proposed Improvements of Martin Luther King Drive

The proposed project consists of the extension of Martin Luther King Jr. Drive from its intersection with Martin Luther King Jr. Avenue south to Galilee Church Road. The proposed project would realign Martin Luther King Jr.

Jackson 2009
4910 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 247 Connector Improvements

Currently, the SR 247 Connector is a four-lane roadway with a depressed 44 foot median going from the western limits of the project, at SR 11/US 41 to Houston Lake Road.

Houston 2009
4956 Blackwelder, Jon R., Pietak, Lynn Marie Sixth Addendum to an Archaeological Survey of the Proposed Lewis Road Improvements

As part of construction coordination with the City of Powder Springs, some minor modification to the proposed improvements within the boundaries of the Powder Springs Park.

Cobb 2009
5318 Pietak, Lynn Marie Addendum to Phase I Survey of the Hickory Flat Rd. Pedestrian Improvement Project

No existing or eligible National Register resources were located within the project's area of potential environmental effect.

Cherokee 2009
5373 Hise, Alana, Pietak, Lynn Marie Addendum to Phase I Archaeological Survey for Intersection Improvements to Crosstown Dr. at S. Peachtree Pkwy

No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.

Washington 1992
Displaying 351 - 360 of 537