5909
|
Pietak, Lynn Marie
|
Addendum to the Phase 1 Archaeologiacl Survey for the Proposed 316 and SR 53 Interchange, Barrow County
|
The proposed project would construct a grade-separated interchange at the existing at-grade intersection of SR 316 and SR 53 in Barrow County. The proposed grade separation would include provision of full interchange providing access to and from SR 316 and SR 53.
|
Barrow
|
2010
|
5910
|
Pietak, Lynn Marie
|
Phase 1 Archaeological Survey of the Proposed Willacoochee Elementary SRTS Project, Atkinson County, Ga
|
The proposed project is part of the Georgia Safe Routes to School (SRTS) Program, which was established to fund infrastructure projects that enable and encourage children, including those with disabilities, to walk and bicycle to school safely.
|
Atkinson
|
2010
|
5911
|
Pietak, Lynn Marie
|
Phase 1 Archaeological Survey of the Proposed SR 67 Bypass at CR 142 Intersection Improvements
|
The proposed project is located on the west side of Statesboro in Bulloch County, Georgia. The project would consist of the construction of a roundabout at the intersection of the SR 67 Bypass and CR 142/Pulaski Road.
|
Bulloch
|
2010
|
5914
|
Pietak, Lynn Marie
|
Phase 1 Archaeological Survey for Dug Gap Mountain Road Roundabout, Whitfield County, Georgia
|
Whitfield County proposes to construct a five-leg two lane roundabout to combine SR 52, College Drive and the 1-75 southbound ramps. West Bridge Road will be relocated approximately 90 feet west of the existing location to provide greater separation between the proposed intersections.
|
Whitfield
|
2010
|
5919
|
Pietak, Lynn Marie
|
Phase 1 Archaeological Survey for Milton SRTS Project, Fulton County, Georgia
|
Project and Soil Descriptions and References: Milton SRTS Project, Fulton County, Georgia, GDOT Project CSSRS-0009-00(443), P.I.
|
Fulton
|
2010
|
5921
|
Pietak, Lynn Marie
|
Phase 1 Arcaheological Survey of Proposed Macon SRTS Project, Bibb County, Georgia
|
The proposed project is part of the Georgia Safe Routes to School (SRTS) Program, which was established to fund infrastructure projects that enable and encourage children, including those with disabilities, to walk and bicycle to school safely.
|
Bibb
|
2010
|
5927
|
Pietak, Lynn Marie
|
Phase 1 Archaeological Survey of the Proposed Improvements to Walt Stephens Road and Flippen Road Bridges over I-75, Henry County, Georgia
|
The proposed project involves the widening of northbound 1-75, for an auxiliary lane, and overlay of the existing three-lane section in Henry County. The widening of 1-75 includes the addition of a 12-foot auxiliary lane and a 12 to 14-foot paved shoulder.
|
Henry
|
2010
|
5928
|
Pietak, Lynn Marie
|
Phase 1 Archaeological Survey Holly Springs Parkway at hickory Road Pedestrian Improvements
|
The proposed project would construct sidewalks and amenities along Hickory Road and Holly Springs Parkway in Holly Springs, Cherokee County, Georgia.
|
Cherokee
|
2010
|
5929
|
Pietak, Lynn Marie
|
Phase 1 Archaeological Survey of the Proposed Chattahoochee Hill Country Regional Greenway Trail
|
The proposed project would construct an approximately 0.75 mile multi-use trail totally within the boundaries of the Boundary Waters Park in Douglas County, Georgia. The trail would be approximately 10 feet wide, and constructed of asphalt or concrete.
|
Douglas
|
2010
|
5930
|
Pietak, Lynn Marie
|
Addendum to Phase 1 Archaeology Survey of Semmes Street Improvement Project, Fulton County, Georgia
|
Originally, the proposed project ran along Semmes Street from East Farris Avenue to Connally Drive in the City of East Point, Georgia for a distance of approximately 1.6 miles.
|
Fulton
|
2010
|