Pietak, Lynn Marie

Report Number Author(s) Title Abstract Summary County Year
4396 Pietak, Lynn Marie Addendum to the Phase I Archaeological Survey of SR 40 from Folkston to Milepost 2.54

The proposed project was field surveyed for historic properties, in compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto. The survey boundary and methodology were established using the GDOT/FHWA Cultural Resource Survey Guidelines.

Charlton 2008
4420 Pietak, Lynn Marie Adden. To Ph. I Arch. Survey for the Widening of Panola Rd. & Assoc. Inter. Improvements

The existing Panola Road bridge over 1-20 and its four-quadrant ramps will be reconstructed in association with the proposed improvements to 1-20 under GDOT project NHS-0000-00 (715), P.1. 000715. The bridge replacement is programmed as P.I.

DeKalb 2008
4424 Hise, Alana, Pietak, Lynn Marie Phase I survey of Intersections in McDuffie and Lincoln Counties

The proposed project would consist of traffic signal upgrades at six (6) intersections within Lincoln and McDuffie Counties, Georgia (see attached Figures 1 A and 1B).

McDuffie 2008
4425 Pietak, Lynn Marie Phase I Arch. Survey for Sigman Road/Old Covington Road Intersection Improvements

The proposed project would reconstruct and realign the intersection of North Salem Road /Sigman Road and Old Covington Road (see attached Figure 1). These roadways would be realigned in order to improve the existing 41 degree skew angle to 61 degrees.

Rockdale 2008
4448 Pietak, Lynn Marie Phase I Archaeological Survey of Rockbridge Road Project Area, Gwinnett County, GA

The proposed project would consist of a proposal to construct a parallel roadway to a portion of U.S. 78 beginning at the intersection of Rockbridge Road/East Park Place and Sharps Trail and ending at Davis Road.

Gwinnett 2008
4449 Pietak, Lynn Marie Phase I Archaeological Survey of Cambridge Street and McGee Road Improvements Project Area

The proposed project was originally included within the limits of GDOT Project CSHPP-0007-00 (535).

Gwinnett 2008
4450 Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed Horizon Parkway Park and Ride Project Area, Gwinnett County, Georgia

In September 2008, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed Horizon Parkway Park and Ride project area. The proposed project consists of the construction of a Park and Ride facility along Horizon Parkway.

Gwinnett 2008
4484 Pietak, Lynn Marie 2nd Addendum to Phase I Archaeological Survey of Gordon County Signal Design Upgrades Project Areas

Since the first addendum, one intersection, SR 3/US 41 at SR 53, has been dropped. In addition, ROW requirements have changed.

Gordon 2009
4489 Pietak, Lynn Marie Phase I Archaeological Survey of the I-75/SR 401 Widening From SR 155 to SR 138, Henry Co., GA

The proposed project involves the addition of one lane within the existing median for both southbound and northbound 1-75 in Henry County making the existing six-lane roadway an eight lane facility.

Henry 2009
4493 Pietak, Lynn Marie Archaeological Survey of Jimmy Carter Blvd. and Singleton Rd. Intersection Improvements

The proposed design improvement for Jimmy Carter Boulevard at Singleton Road's westbound approach includes an additional left-turn lane (creating dual left-turn lanes) and a dedicated right-turn lane.

Gwinnett 2009