4051
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey of SR 21 @ SR 275 Intersection Improvements, Effingham County, Georgia
|
The proposed project, Phase I Archaeological Survey of SR 21 at SR 275 Intersection Improvements, Effingham County, Georgia Project Description GDOT Project CSSFT-0008-00(062), PI 0008062, would improve the intersection of SR 21 at SR 275/Rahn Station Road in Effingham County, Georgia.
|
Effingham
|
2007
|
4054
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey for SR 53 Improvements, Gordon and Pickens Counties, Georgia
|
The proposed SR-53 project includes re-alignment of the existing highway to bring the horizontal and vertical curves up to current design standards and adding shoulders for a distance of approximately 1.5 miles from a point 3,700-feet east of Ryo Mountain Road in Gordon County (MP 26.9) east to a
|
Gordon
|
2007
|
4057
|
Pietak, Lynn Marie
|
I-85 at Lawrenceville-Suwanee Rd. Landscaping and Sidewalk Project, Gwinnett County, Georgia
|
The proposed project would construct sidewalks the along the west side of Lawrenceville-Suwanee Road from Satellite Boulevard to Old Peachtree Road. The project would also construct pedestrian facilities along both sides of the roadway.
|
Gwinnett
|
2007
|
4060
|
Duff, Eric Anthony, Pietak, Lynn Marie
|
2nd Addendum to Archaeological Survey of SR 280 Bridge Replacement over the Chattahoochee River, Cobb and Fulton Counties, Georgia
|
Original: The proposed bridge would be constructed east of the existing bridge, at a centerline-to-centerline off-set distance of approx. 17 ft. The bridge would be approx.
|
Fulton
|
2007
|
4075
|
Pietak, Lynn Marie
|
Second Addendum to Ph. 1 Archaeological Survey of Houston Co. Signal Design Upgrades
|
The proposed project consists of traffic signal upgrades at 19 intersections in Houston County, GA. The proposed project is designed to improve the overall efficiency and safety of traffic flow, utilizing upgraded traffic signal displays and traffic signal control equipment.
|
Houston
|
2007
|
4076
|
Pietak, Lynn Marie
|
Ph. 1 Arch. Survey of the Marietta Blvd. at Bolton Rd. Int. Impr. Project Area, Fulton Co., GA
|
The proposed project would consist of the reconfiguration of the existing six-way intersection at Marietta Boulevard, Bolton Road, Adams Drive and Plant Road in Atlanta, Georgia.
|
Fulton
|
2007
|
4080
|
Pietak, Lynn Marie
|
Nail Road Improvements Archaeological Investigation
|
The proposed project would pave and upgrade Nail Road to meet 35 mph design speed (Figure 1). Currently, Nail Road is a gravel road and is constructed for speeds below 3 5 mph. The project would include replacing two undersized culverts. The stream crossing at Sta.
|
Henry
|
2007
|
4104
|
Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey of SR 17/SR75 over the Hiawassee Rover
|
Project BRST-0000-00(301), Towns County, P.I. No. 0000301, Addendum to Phase I Archaeological Survey of SR 17/SR 75 over the Hiawassee River, would replace the structurally deficient bridge on State Route (SR) 17/SR 75 over the Hiawassee River, 6.5 miles south of Hiawassee, Georgia.
|
Towns
|
2007
|
4105
|
Pietak, Lynn Marie
|
Phase I Arch. Survey for the Proposed Improvements to Godby Rd., Clayton Co., GA
|
This project, Phase I Archaeological Survey for the Proposed Improvements to Godby Road. Clayton County, Georgia, GDOT Project CSSTP-0006-00 (860). P.I.
|
Clayton
|
2007
|
4106
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey of the SR 133 over the GA/FL Railnet, Dougherty Co., GA
|
The proposed project, Phase I Archaeological Survey of the SR 133 over the GA/FL Railnet, Dougherty County, Georgia GDOT Project BRST-093-1 (44), P.I. 432125 would consist of replacing the southern bridge on S.R. 133/ Moultrie Road over Georgia & Florida Railnet in Albany, Georgia.
|
Dougherty
|
2007
|