8051
|
Pietak, Lynn Marie, Hunt, Michael
|
Improvements to Perimeter Summit Parkway, Lake Hearn Drive and Parkside Place
|
The proposed project consists of construction along Perimeter Summit Parkway, Lake Hearn Drive, and Parkside Place in DeKalb County.
|
Stephens
|
2014
|
8077
|
Pietak, Lynn Marie, Hunt, Michael
|
Second Addendum to the Phase 2C of Noonday Creek Multi-Use Trail
|
The overall proposed project would construct an ADA compliant, ten-foot to 12-foot wide multi-use trail beginning at the intersection of US 41 and Barrett Parkway and end at Bells Ferry Road, for a total project length of approximately 4.7 miles.
|
Wilkes
|
2014
|
8146
|
Pietak, Lynn Marie
|
2012 Addendum to Phase I Archaeological Survey of Carpenter Road, Tift County, Georgia
|
The proposed project calls for the reconstruction, rehabilitation, and widening of Carpenter Road (CR 75) in Tift County. The project begins at SR 520/US 82 and extends north to Davis Road (CR 216) and is partially within the city limits of the City of Tifton.
|
Houston
|
2012
|
8176
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey for Traffic Operation Improvements at Thirteen Intersections in Franklin, Hart, and Madison Counties, Georgia
|
The proposed project would consist of upgrading the existing traffic signal installations at the following 13 intersections in Franklin, Hart and Madison Counties:
Hart County:
1. SR 8 / US 29 at SR 17 / Royston Bypass in the City of Royston
|
DeKalb
|
2012
|
8201
|
Pietak, Lynn Marie, Silliman, Garrett W.
|
Phase I Archaeological Survey of the Proposed South Lake C-Tran Bus Transfer Facility Project Area, Clayton County, Georgia
|
In May 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed South Lake C-Tran Bus Transfer Facility project area.
|
Chatham
|
2013
|
8209
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of the Proposed SR 324 Widening Project Area, Gwinnett County, Georgia
|
On May 25th and 26, 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed widening of SR 324 near the town of Hog Mountain, Georgia.
|
Camden
|
2014
|
8211
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey of the Proposed Marta West Line Project Area, Fulton County, Georgia
|
In July and August 2004, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed MARTA West Line project area. The project area is located on the west side of Atlanta, Fulton County, Georgia, and includes portions of I-20 and Martin Luther King Jr.
|
Lincoln
|
2014
|
8273
|
Pietak, Lynn Marie
|
Fourth Addendum to the Phase I Archaeological Survey for the Widening of West Bay Street, Savannah, Chatham County, Georgia
|
The proposed improvements would include a 12-foot wide outside travel lane and an 11-foot wide inner travel lane in each direction. The project also includes a raised median varying in width from 10 to 66 feet. Turn lanes would be included at signalized intersections.
|
Liberty
|
2004
|
8343
|
Price, George D., Pietak, Lynn Marie, Holland, Jeffrey L.
|
Additional Survey and Phase II Testing of Six Sites, West Ringgold-Center Point Transmission Line Project, Catoosa and Whitfield Counties, Georgia
|
TRC Garrow Associates, Inc., was contracted by TV A to conduct additional Phase I survey and Phase II testing of six sites for the West Ringgold-Center Point transmission line in Catoosa and Whitfield counties, Georgia.
|
Union
|
1997
|
8346
|
D'Angelo, James J., Pietak, Lynn Marie, Holland, Jeffrey L.
|
Phase I Cultural Resource Survey for the Proposed Dawsonville Highway Regional Wastewater Facilities Project, Hall County, Georgia
|
TRC conducted a Phase I cultural resources survey for the proposed Dawsonville Highway Regional Wastewater Facilities Project in Hall County, Georgia, near Gainesville, during November 2002. The project was undertaken for Wiedeman & Singleton.
|
Coweta
|
2013
|