8211
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey of the Proposed Marta West Line Project Area, Fulton County, Georgia
|
In July and August 2004, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed MARTA West Line project area. The project area is located on the west side of Atlanta, Fulton County, Georgia, and includes portions of I-20 and Martin Luther King Jr.
|
Lincoln
|
2014
|
8209
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of the Proposed SR 324 Widening Project Area, Gwinnett County, Georgia
|
On May 25th and 26, 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed widening of SR 324 near the town of Hog Mountain, Georgia.
|
Camden
|
2014
|
8201
|
Pietak, Lynn Marie, Silliman, Garrett W.
|
Phase I Archaeological Survey of the Proposed South Lake C-Tran Bus Transfer Facility Project Area, Clayton County, Georgia
|
In May 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed South Lake C-Tran Bus Transfer Facility project area.
|
Chatham
|
2013
|
8176
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey for Traffic Operation Improvements at Thirteen Intersections in Franklin, Hart, and Madison Counties, Georgia
|
The proposed project would consist of upgrading the existing traffic signal installations at the following 13 intersections in Franklin, Hart and Madison Counties:
Hart County:
1. SR 8 / US 29 at SR 17 / Royston Bypass in the City of Royston
|
DeKalb
|
2012
|
8146
|
Pietak, Lynn Marie
|
2012 Addendum to Phase I Archaeological Survey of Carpenter Road, Tift County, Georgia
|
The proposed project calls for the reconstruction, rehabilitation, and widening of Carpenter Road (CR 75) in Tift County. The project begins at SR 520/US 82 and extends north to Davis Road (CR 216) and is partially within the city limits of the City of Tifton.
|
Houston
|
2012
|
8077
|
Pietak, Lynn Marie, Hunt, Michael
|
Second Addendum to the Phase 2C of Noonday Creek Multi-Use Trail
|
The overall proposed project would construct an ADA compliant, ten-foot to 12-foot wide multi-use trail beginning at the intersection of US 41 and Barrett Parkway and end at Bells Ferry Road, for a total project length of approximately 4.7 miles.
|
Wilkes
|
2014
|
8051
|
Pietak, Lynn Marie, Hunt, Michael
|
Improvements to Perimeter Summit Parkway, Lake Hearn Drive and Parkside Place
|
The proposed project consists of construction along Perimeter Summit Parkway, Lake Hearn Drive, and Parkside Place in DeKalb County.
|
Stephens
|
2014
|
7997
|
Pietak, Lynn Marie, Blackwelder, Jon R.
|
Phase I Archaeological Survey of SR 9 from Upper Hembree Road to Windward Way, Fulton County, Georgia
|
This project is within the City of Alpharetta, Fulton County, and consists of the widening and reconstruction of SR 9, reconfiguration of sideroads, pedestrian improvements and signal upgrades. The work is divided into two projects, PI 721790 and 721780.
|
Gordon
|
1996
|
7988
|
Hise, Alana, Pietak, Lynn Marie
|
Phase I Archaeological Survey of the Proposed Intersection Improvements at State Route 247 and County Route 189/Walker Road, Peach County, Georgia
|
On March 11, 2009, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological investigation of the proposed intersection improvements at State Route (SR) 24 7 at County Route (CR) 189/Walker Road in Peach County, Georgia.
|
Greene
|
1999
|
7984
|
Quirk, Phillip W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of the Proposed Safety and Operational Improvements to Nance Road, Cobb County, Georgia
|
During September 2010, Edwards‑Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed safety and operational improvements to Nance Road. In addition, a proposed 2.9 acre borrow area was surveyed in February 2011.
|
Greene
|
1995
|