3154
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey of Memorial Drive Sidewalks Project Area, Dekalb County, Georgia
|
The proposed project would consist of improvements along a 3.41-mile corridor on Memorial Drive extending from Candler Road to Mountain Drive, excluding the area in front of Avondale Mall in DeKalb County.
|
DeKalb
|
2005
|
3155
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of Five Sidewalk Expansion Locations, Dekalb County, Georgia
|
The proposed project includes five sidewalk improvement areas: along Briarcliff Road, from N.
|
DeKalb
|
2005
|
3156
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Intensive Archaeological Survey of the Pobiddy Road Bridge Replacement, Talbot and Upson Counties, Georgia
|
Original: The project consists of 0.66 mile of bridge replacement on CR 172/Pobiddy Road over the Flint River. The proposed improvements would replace the existing bridge with a new structurally adequate bridge.
|
Talbot
|
2005
|
3157
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey of the Thurman and Fairview Roads Project Area, Henry County, Georgia
|
The proposed project would consist of improvements to the intersection of Fairview Road and Thurman Road in Henry County. Thurman and Fairview Roads are two-lane urban facilities that intersect at the northern terminus of Thurman Road and form a "T" intersection.
|
Henry
|
2005
|
3158
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of Flakes Mill Road over the South River, Dekalb County, Georgia
|
The proposed project would consist of the replacement of the existing Flake's Mill Road Bridge over the South River in DeKalb County approximately 1.25 miles south of the intersection of Flakes Mill Road and Flat Shoals Parkway.
|
DeKalb
|
2005
|
3159
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of Atlanta Road over the Chattahoochee River , Cobb and Fulton Counties, Georgia
|
The proposed project would replace the existing two lane bridge on Atlanta Road over the Chattahoochee River with a 4-lane bridge new structure built on an offset alignment immediately to the west.
|
Cobb
|
2005
|
3163
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of SR 81 at CR 309/653 and SR 162 Project Area, Newton County
|
The proposed project involves improvements to several intersections with SR 81 west of Porterdale, Georgia.
|
Newton
|
2005
|
3167
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of Proposed Improvements to Old Covington Highway, Rockdale County, Georgia
|
The proposed project would widen Old Covington Highway from a narrow two lane facility with no roadway shoulders to a three lane facility with two 12 foot travel lanes and a 14 foot center turn lane.
|
Rockdale
|
2005
|
3174
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archeaological Survey of the Proposed Carter Hill Substation Project Area, Barrow County, Georgia
|
On April 15, 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the Carter Hill Substation.
|
Barrow
|
2005
|
3190
|
Pietak, Lynn Marie
|
Phase I Archaeological Surve of Towne Lake Parkway at I-575 Project Area, Cherokee County Georiga
|
Short form for negative findings on Phase I Archaeological Survey of Towne Lake Parkway at I-575 Project Area, Cherokee County, Georgia. The project area is located on the Kennesaw Quadrangle. A total of five previously recorded sites are within a one kilometer radius of the project area.
|
Cherokee
|
2005
|