Report Number Author(s) Title Abstract Summary County Year
9137 Pietak, Lynn Marie Adden. to Phase I Survey for the Proposed Bridge Replacement at CR 467 at Cane Creek

The proposed project is located on CR 467/Bickley Highway at the crossing of Cane Creek in Ware County, Georgia. The proposed project would begin approximately 1,230 feet west of the bridge and end approximately 1,270 feet east of the bridge.

Cherokee 2001
9139 Pietak, Lynn Marie Phase I Arch. Survey of US 41/US 76/SR 3/North Dalton Bypass at SR 71, Whitfield County

The proposed project is located on the north side of Dalton in Whitfield County, Georgia. The project would involve intersection improvements to US 41/US 76/SR 3/North Dalton Bypass and SR 71/Cleveland Highway.

Colquitt 2015
9143 Pietak, Lynn Marie Addendum to Ph. I Arch Survey of the Kennesaw Mountain to the Chattahoochee River Trail

The proposed project would construct a 10-foot (desirable) to 8-foot (minimum) multi-use concrete path along the project corridor, as described below.

Mitchell 2015
9145 Pietak, Lynn Marie Phase I Arch. Survey of Klondike Road Sidewalks Project Corridor, DeKalb County, GA

The project would encompass the intersection of Klondike Road and S. Goddard Road in the southeast corner of DeKalb County, Georgia. The project limits on Klondike Road would begin approximately 1,610 feet (0.30 mile) south and end approximately 430 (0.08 mile) north of its intersection with S.

Webster 2015
9147 Pietak, Lynn Marie 2nd Addendum to Ph. I Arch. Survey of Proposed ATMS Installation and Signal Upgrades

Please see attached sheets for original and first addendum project descriptions. Current description: Changes to the Clayton County ATMS project would occur at only two intersections.

Cherokee 2005
9163 Pietak, Lynn Marie, Blackwelder, Jon R. Phase I Archaeological Survey of US 41/US 76/SR 3/North Dalton Bypass at SR 71 Intersection Improvement, Whitfield County, Georgia

The proposed project is located on the north side of Dalton in Whitfield County, Georgia. The project would involve intersection improvements to US 41/US 76/SR 3/North Dalton Bypass and SR 71/Cleveland Highway.

Lowndes 1959
9165 Pietak, Lynn Marie Addendum to Archaeological Survey of I-20 Eastbound Improvements from Columbia Dr. to Panola Road, DeKalb County, Georgia

The proposed project consists of an operational improvement on I-20 Eastbound in DeKalb County in the vicinity of the I-20/I-285 interchange, from approximately the I-20/Columbia Drive interchange to the I-20/Panola Road interchange, for a total distance of approximately 4.5 miles.

Pulaski 2001
9166 Quirk, Phillip W., Pietak, Lynn Marie Addendum to Phase I Survey of the I-75/SR 401 Widening from SR 155 to SR 138, Henry Co., GA

This addendum addresses the improvements associated with the Walt Stephens Road Bridge over 1-75 as described in the attached project description.

Fulton 0
9167 Pietak, Lynn Marie, Quirk, Phillip W. Addendum to Cedarcrest Road Improvements, Cobb and Paulding Counties, Georgia

Cedarcrest Road is a hvo-lane roadway that runs approximately 6.7 miles between US 41/Cobb Parkway northwest in Cobb County and the SR 92/SR 381 intersection (DaJias Acworth Highway) with the Hiram Acworth Highway (SR 92) at the Cross Roads community of Paulding County.

Fulton 2007
9172 Pietak, Lynn Marie, Blackwelder, Jon R. Phase I Archaeological Survey of Johnson Ferry Road and Sandy Springs Circle Intersection Improvements

As part of a phase construct1on plan for the corridor improvements along the Johnson Ferry Road and Glen ridge Drive in the City of Sandy Springs, intersection improvements are proposed at the Sandy Springs Circle intersection with Johnson Ferry Road.

Fayette 2008