Back to top

Trudeau, Mary F.

Report Number Author(s) Title Abstract Summary County Year
8934 Trudeau, Mary F. Phase I Archaeological Survey of the Intersection of SR 119 and SR 17 in Effingham County, Georgia

The proposed project is located in Effingham County in the City of Guyton at the intersection of SR 119/Springfield Avenue and SR 17/Central Boulevard.

Jackson County, GA 1997
8995 Trudeau, Mary F. Phase I Archaeological Survey for the Replacement of Three Bridges on State Route 158 over the Satilla River, Satilla River Overflow, and Fullwood Creek in Ware County, Georgia

In October 2015, Edwards-Pitman Environmental, Inc.

Columbia County, GA 2009
9305 Trudeau, Mary F. Phase I Archaeological Survey of the Proposed Northside Parkway Trail, Fulton County, Georgia

The proposed project would construct a 10-foot wide multi-use trail on the north side of State Route (SR) 41/Cobb Parkway between Northgate Drive NW and Mt. Paran Road NW.

Fulton County, GA 2016
9542 Trudeau, Mary F. Second Addendum to the Phase I Survey for the Replacement of the Railroad Bridge over SR 41/US 27 Alternate, Meriwether County, Georgia

 

Meriwether County, GA 2016
9582 Trudeau, Mary F., Balinger, Duncan Addendum Phase I Archaeological Survey for the I-85 General Purpose Widening from North of CR 134/Hamilton Mill Road to North of SR 211, Gwinnett, Barrow, and Jackson Counties, Georgia.

This addendum survey is to address portions of the project area that lie outside of previous archaeological survey coverage. The two GDOT P.I. Nos.

Barrow County, GA 2017
9583 Moss, Richard A., Trudeau, Mary F. Phase I Archaeological Survey of Proposed Traffic Signal Upgrades at Nine Intersections in Chatham County, Georgia

Edwards-Pitman Environmental, Inc. (EPEI), under a contract with Wolverton & Associates, Inc., conducted Phase I archaeological survey for the Georgia Department of Transportation (GDOT) project to upgrade traffic signals at nine intersections in Chatham County, Georgia (PI No.

Chatham County, GA 2017
9657 Trudeau, Mary F. Phase I Archaeological Survey of Improvements to SR 5/Bill Arp Road, CR 198/Banks Mill Road, CR 174/Dorsett Shoals Road, Pool Road, and Big A Road, Douglas County, Georgia

Edwards-Pitman Environmental, Inc.

Douglas County, GA 2017
9673 Trudeau, Mary F. Addendum Phase I Survey of the Proposed Improvements to Douthit Ferry Road, Bartow County, Georgia

In September 2016, Edwards-Pitman Environmental, Inc. (EPEI) conducted an addendum Phase 1 archaeological survey for the proposed improvements to Douthit Ferry Road in Bartow County (Georgia Department of Transportation [GDOT] Project STP-0007-00(494), P.I. No.

Bartow County, GA 2017
9745 Trudeau, Mary F. Second Addendum to the Phase I Archaeological Survey of the Beaver Ruin Multi-Use Trail, Gwinnett County, Georgia

The proposed second addendum, to the project would provide a 1 0-foot multi-use path for bicycle and pedestrian accommodations along the south side of Beaver Ruin Road (State Route [SR] 378) for approximately 1.5 miles from the intersection of Beaver Ruin Road (SR 378) and Price Place to the inte

Gwinnett County, GA 2017
9946 Trudeau, Mary F. Addendum to the Phase I Archaeological Survey of the SR 400 at I-285 Interchange Reconstruction, Fulton and DeKalb Counties, Georgia.

The original survey for this project was conducted by GDOT personnel and reported in a GDOT Archaeological Assessment In-House Survey Report (Williams 2014). No field survey was conducted as previous archaeological surveys had covered the APE and ESC for this project.

Fulton County, GA 2017
Displaying 11 - 20 of 34