3812
|
Pietak, Lynn Marie, Quirk, Phillip W.
|
Phase I Archaeological Survey of the Proposed Thornton Road Park and Ride Project Area, Cobb County, Georgia
|
In November 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed Thornton Road Park and Ride project area. The proposed project consists of constructing a park and ride lot facility on an 18.94-acre site located in Cobb County, Georgia.
|
Cobb
|
2006
|
3824
|
Quirk, Phillip W.
|
Phase I Archaeological Survey of the Proposed SR 52 Bridge Replacement over Candler Creek, Hall County, Georgia
|
Management Summary: During October 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the SR 52 over Candler Creek bridge replacement project.
|
Hall
|
2006
|
3911
|
Pietak, Lynn Marie, Quirk, Phillip W.
|
Phase I Archaeological Survey of the State Route 191 Over Scull Shoal Creek Bridge Replacement, Madison County, Georgia
|
During November 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the State Route (SR) 191 over Scull Shoal Creek Bridge Replacement.
|
Madison
|
2007
|
3920
|
Pietak, Lynn Marie, Quirk, Phillip W.
|
Phase I Archaeological Survey of the Proposed Bright Star Road Park and Ride Project Area, Douglas County, Georgia
|
In February 2007, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed Bright Star Road Park and Ride project area. The proposed project consists of constructing a park and ride lot facility on an 8.6-acre site located in Douglas County, Georgia.
|
Douglas
|
2007
|
3930
|
Quirk, Phillip W.
|
Phase I Archaeological Survey of Bethlehem Road Improvement Project Corridor, Henry County, Georgia
|
In August 2006, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey for the proposed Bethlehem Road improvement project, under a contract with Henry County SPLOST. The length of the project corridor is approximately 1,450 feet (ft).
|
Henry
|
2007
|
3993
|
Regnier, Amanda Leigh, Quirk, Phillip W.
|
Archaeological Data Recovery at the Big Tucsawhatchee Site (9PU20) Pulaski County, Georgia
|
In November and December 2005, Edwards-Pitman Environmental, Inc. conducted Phase III data recovery excavations at the Big Tucsawhatchee site (9PU20), located on the terraces above Big Creek (formerly Tucsawhatchee Creek) along State Route 230 in Pulaski County, Georgia.
|
Pulaski
|
2007
|
4017
|
Quirk, Phillip W.
|
Phase I Archaeological Survey of the Proposed Tara Boulevard Park and Ride Project Area, Clayton Coutny, Georgia
|
In June 2007, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed Tara Boulevard Park and Ride Facility project area.
|
Clayton
|
2007
|
4128
|
Quirk, Phillip W., Jordan, William R.
|
Cultural Resources Reconnaissance Forest Park Quarry Expansion Site Clayton County, Georgia
|
R. S. Webb & Associates (RSWA) conducted a cultural resources reconnaissance of the proposed 48 acres Forest Park Quarry expansion project tract in October 2006.
|
Clayton
|
2006
|
4129
|
Quirk, Phillip W.
|
Phase I Archaeological Survey of the Proposed Social Circle Bypass, Newton and Walton Counties, Georgia
|
The proposed project would consist of the construction of a new location bypass beginning at a point along SR 11 / South Cherokee Road south of the southern city limits of Social Circle in Newton County, and continuing northeasterly to East Hightower Trail in the vicinity of Standridge Drive near
|
Newton
|
2007
|
4132
|
Quirk, Phillip W.
|
Phase I Archaeological Survey of the Proposed Turner Hill Road Improvements, Dekalb County, Georgia
|
During February 2007, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed corridor for the Turner Hill Road Improvements project. The project corridor is located in DeKalb County, Georgia, and is approximately 1.1 miles in length.
|
DeKalb
|
2007
|