1728 |
Benson, Robert W. |
Reconnaissance Survey of the Proposed Bennett Creek Interceptor |
The Gwinnett County Department of Public Utilities Planning and Engineering Division contracted with Southeastern Archeological Services, Inc. |
Gwinnett County, GA |
1995 |
1729 |
Benson, Robert W. |
Reconnaissance Survey of the Proposed Upper Apalachee River Interceptor Gwinnett, County, Georgia |
The Gwinnett County Department of Public Utilities Planning and Engineering Division contracted with Southeastern Archeological Services, Inc. |
Gwinnett County, GA |
1995 |
1730 |
Benson, Robert W. |
Reconnaissance Survey of the Proposed Sewer Line Along Upper Brushy Fork |
The Gwinnett County Department of Public Utilities Planning and Engineering Division contracted with Southeastern Archeological Services, Inc. |
Gwinnett County, GA |
1995 |
1731 |
Benson, Robert W. |
Reconnaissance Survey of the Proposed Tributary to Lake Carlton Interceptor |
The Gwinnett County Department of Public Utilities Planning and Engineering Division contracted with Southeastern Archeological Services, Inc. |
Gwinnett County, GA |
1995 |
1732 |
Benson, Robert W. |
Reconnaissance Survey of the Proposed Sewer Line along the Upper Tributary of Brushy Fork |
The Gwinnett County Department of Public Utilities Planning and Engineering Division contracted with Southeastern Archeological Services, Inc. |
Gwinnett County, GA |
1995 |
1738 |
Braley, Chad O., Benson, Robert W. |
An Intensive Cultural Resources Survey of the Proposed New Water Treatment Plant and Associated Water Lines and Access Roads, Hones |
An intensive cultural resources survey of two alternative locations of a new water treatment plant site and 3.8 miles of water lines and access roads located 15 archeological sites. |
Bibb County, GA |
1994 |
1771 |
Braley, Chad O., Benson, Robert W. |
Cultural Resources Survey of Compartments I-2, J-5, Q-5, and O-7, Chattahoochee and Muscogee Counties, Fort Benning, Georgia |
Southeastern Archeological Services, Inc. (SAS) of Athens, Georgia contracted with Fort Benning, Georgia Environmental Management Division (EMD) to conduct a cultural resources survey of approximately 1783 ha (4406 ac) on Fort Benning. |
Chattahoochee County, GA |
1997 |
1815 |
Benson, Robert W. |
A Cultural Resources Survey of the Proposed Airline 46/12 kV Substation Hart County, Georgia |
An intensive survey for cultural resources was conducted prior to the building of Oglethorpe Power Corporation's proposed 5.5 acre Airline 115/46 kV substation in Hart County, Georgia. The property was formerly an agricultural field and is now a cattle pasture. |
Hart County, GA |
1991 |
1821 |
Benson, Robert W., Rogers, Ronnie H. |
Preliminary Assessment of the Archeological and Endangered Species Potential of a 3225 Acre Tract Near Fort Benning, Georgia |
Based largely on existing data bases concerning archeological sites and endangered species in the general vicinity of the project area, but also relying on three days of cursory field inspection, we have formulated an assessment of the potential for significant archeological sites and endangered |
Chattahoochee County, GA |
1992 |
1990 |
Benson, Robert W. |
Phase I Intensive Cultural Resources Survey of Wetland Preservation Buffers Around Eleven Creek Crossings of the Proposed Fall Line Freeway |
To minimize future impacts to important waterways and to accommodate the United States Fish and Wildlife Service, the Georgia Department of Transportation (GDOT) proposed wetland preservation buffers around each water crossing traversed by the proposed Fall Line Freeway (FLF) from Gordon to Sande |
Wilkinson County, GA |
2000 |