Back to top

Richardson, Rick R.

Report Number Author(s) Title Abstract Summary County Year
7305 Richardson, Rick R. Archaeological Assessment of Project STP-1800(14), Gordon County

The proposed project would consist of the construction of passing lanes on SR 136 at two locations between Resaca and Nickelsville. Site 1 will provide an eastbound passing lane between Mile Post 10.0 and Mile Post 11.3.

Lowndes County, GA 1986
7309 Richardson, Rick R. Archaeological Assessment of Project STP-065-2(16), Gordon County

The proposed project would consist of the construction of three passing lanes on SR 53, and a right turn lane for the Sonoraville School. A west bound passing lane will be constructed from MP 14 . 67 to 15.80.

Lowndes County, GA 1990
7312 Richardson, Rick R. Archaeological Assessment of Project IM-75-3(197), Gordon County

The proposed project is an interchange improvement at I-75 and SR 225 in Gordon County. The proposed project would begin on SR 225 west of I-75 ramps then would continue easterly to an ending point east of I-75 ramps.

Gwinnett County, GA 2001
7318 Richardson, Rick R. Archaeological Assessment of Project IM-75-3 (211) Gordon County

The proposed project would improve parking areas and upgrade restroom facilities at State Rest Area #34 between Resaca and Calhoun in Gordon County. All construction will be undertaken within existing right-of-way, no additional right-of-way would be required.

Tift County, GA 2008
7319 Richardson, Rick R. Archaeological Assessment of Project IM-75-3(215) Gordon Co.

The proposed project would improve parking areas and upgrade restroom facilities at State Rest Area #35 between Resaca and Calhoun in Gordon County. All construction will be undertaken within existing right-of-way, no additional right-of-way would be required.

Chatham County, GA 2013
7404 Richardson, Rick R. Archaeological Assessment of the Project STP-155-1(19)

The proposed project would widen and reconstruct SR 96 in Fort Valley from near Campus Drive/CS 617 easterly to Anderson Street/CS 621. The total length of the proposed project is approximately 1.82 kilometers (1.13 miles).

Union County, GA 2009
7491 McIntosh, Paul, Richardson, Rick R. Archaeological Reassessment of Project STP-155-1 (19), Peach County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project STP-155-1(19), Peach County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRH

Heard County, GA 2000
7501 Richardson, Rick R. Archaeological Assessment of Project PFH-24(1), Putnam County

The proposed project would replace the narrow and structurally deficient bridge on CR 212 over Town Creek southwest of Eatonton, Georgia. The existing right-of-way on CR 212 is approximately 30 m (100 ft).

Douglas County, GA 1991
7633 Richardson, Rick R. Archaeological Assessment of Project PFH-27(1), Putnam County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project PFH-27(1), Putnam County have been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP)"

Cherokee County, GA 1993
8328 Richardson, Rick R. Archaeological Assessment of Project STP-1362(4), Gordon County

This project consists of the reconstruction of Cash Road from CR 481 south to State Route 53 in Sonoraville, Georgia. Existing right- of-way for the proposed project is 28 feet. Required proposed right-of-way will be approximately 80 feet.

Cherokee County, GA 2013
Displaying 121 - 130 of 230