Back to top

Richardson, Rick R.

Report Number Author(s) Title Abstract Summary County Year
6253 Richardson, Rick R. Archaeological Assessment of Project IR-75-1(193), Cook County

The proposed project consists of the widening of State Route 37 and the construction of a bridge over Interstate Highway 75 from approximately 457 meters (1500 feet) west of the existing bridge to approximately 183 meters (600 feet) east of the existing bridge for a distance of approximately 0.7

Wayne 1973
6256 Richardson, Rick R. Archaeological Assessment of Project IM-95-1(160), Glynn County

The proposed project would consist of the connection of the water system of Safety Rest Area 105 (located along I--95) to the water system of Glynn County. The new water main would run south of an existing sewer line ana extend from Jetport Road westerly to 1-95.

Glynn 1978
6268 Richardson, Rick R. Archaeological Assessment of Project NH-009-2(90), Glynn County

The purpose of the survey was to locate, identify and evaluate the significance of any archaeological resources within the proposed project's area of potential environmental effect.

Liberty 1992
6296 Richardson, Rick R. Archaeological Assessment of Project EDS-441(34), Clinch County

The proposed project would widen U.S. 441 from the south city limits of Homerville to the north city limits for a distance of 2.72 km (1.70 mi). From the south city limits to Forest Avenue the existing roadway would be widened symmetrically.

Clinch 1995
6297 Richardson, Rick R. Archaeological Assessment of Projects EDS-84(16)(17), Lowndes, Lanier, Clinch Counties

Projects EDS-84 (16) (17) would widen US 84/SR 38 in Lowndes, Lanier,. and Clinch Counties. EDS-84(16) would begin at the existing 4-lane section just west of the Alapaha River and would end at CR 207 in DuPont.

Wilkes 1997
6298 Richardson, Rick R. Archaeological Assessment of Project EDS-84(20), Clinch County

Project EDS-84(20) consists of the widening of SR 38 in Clinch County. The proposed project would begin at the west city limits of Homerville and continues easterly to an end point approximately 91.4 m (300 ft) west of Woodyard Creek. In addition, a bridge is to be constructed over Taut Creek.

Wilkes 1994
6328 Richardson, Rick R. Archaeological Assessment of Project BRM-9023(2), Cobb County

The proposed project would consist of the removal and replacement of the existing bridge over Powder Springs Creek on SR 6 Business/Powder Springs Road. The existing right-of-way varies from approximately 35.0 m (114 ft) to 50 m (164 ft).

Wilcox 1997
6428 Richardson, Rick R. Archaeological Assessment of Safety Project SR 124/CR 106, Gwinnett County

The proposed project would widen SR 124 at the intersection of CR 106/Old Peachtree Road in Gwinnett County. Left turn lanes would be provided for both northbound and southbound traffic on SR 124. Also, CR 106/Old Peachtree Road would be relocated to intersect with SR 124 at 90 degree angles.

Cook 1996
6432 Richardson, Rick R. Archaeological Assessment of Project STP-0910(13), Gwinnett County

The proposed project consists of intersection improvements at SR 124 and SR 324 by providing alignment corrections to lower the existing higher degree curve.

Cook 1994
6441 Richardson, Rick R. Archaeological Assessment of Project DPI-0202(001), Gwinnett County

The proposed project consists of the construction of the Clyde Williams Boulevard connector from Ronald Reagan Parkway northeasterly to SR 124 and easterly to North Road. The Clyde Williams Boulevard connector from Ronald Reagan Parkway to SR 124 would be within the existing right-of-way.

Glynn 1992
Displaying 91 - 100 of 230