5843
|
Richardson, Rick R.
|
Archaeological Assessment of Project STPN-003-3(50), Clarke County
|
The proposed project would add an approximately 3.6 meter (12 feet) travel lane on the eastbound Athens Perimeter (SR 8/10 LP/15 ALT) between the eastbound on-ramp from CR 600/North Avenue and the eastbound off-ramp to southbound SR 10 LP/SR 15 for a total distance of approximately 0.3 kilometer
|
Fulton
|
1995
|
5848
|
Richardson, Rick R., Fleming, Sherry
|
Archaeological Assessment of Project NH-051-1(23), Clarke County
|
Project NH-051-1(23) would widen Winterville Road/CR 470 and add exit and entrance ramps from Winterville Road to the Athens Bypass/SR 100 Loop.
|
Fulton
|
1992
|
5859
|
Richardson, Rick R.
|
9CY(DOT)2, Unpublished Field Notes Volume III
|
Site 9Cy(DOT)2 represents a low density Early Archaic surface lithic scatter. The site is located in Bluffton, Georgia, east of US 27/SR 1 and south of CR 130 in an agricultural field.
|
Fulton
|
1986
|
5860
|
Richardson, Rick R.
|
9CY(DOT)3, Unpublished Field Notes Volume III
|
Site 9Cy(DOT)3 represents a low density Late Archaic and possibly Early Woodland surface lithic scatter. The site is located in Bluffton, Georgia, east of US 27/SR 1 and south of CR 130 in an agricultural field approximately 30 meters from site 9Cy(DOT)2.
|
Fulton
|
1986
|
5861
|
Richardson, Rick R.
|
9CY(DOT)4, Unpublished Field Notes Volume III
|
Site 9Cy(DOT)4 is represented by the remains of an historic house site. The site is located in Bluffton, Georgia, east of US 27/SR 1 near the southern city limits in a heavily overgrown area. The site is partially within the required right-of-way for GDOT project EDS-27(148), Clay County.
|
Cobb
|
1986
|
5862
|
Richardson, Rick R.
|
9CY(DOT)5, Unpublished Field Notes Volume III
|
Site 9Cy(DOT)5 represents a low density Late Paleoindian surface lithic scatter. The site is located in Bluffton, Georgia, east of US 27/SR 1 and south of CR 130 in an agricultural field.
|
Fulton
|
1986
|
6007
|
Richardson, Rick R.
|
Archaeological Assessment of Project STP-090-1(16), Coffee County
|
The proposed project would widen SR 135/US 221 from SR 206 Connector to just south of CR 146, and from approximately 260.60 m (855 ft) south of CR 148 to approximately 201.17 m (660 ft) north of CR 148. Additionally, CR 148 will be realigned to intersect SR 135/US 221 at 90 degrees.
|
Ware
|
2010
|
6009
|
Richardson, Rick R.
|
Archaeological Assessment of Project STP-105-1 (26), Coffee County
|
The proposed project is an intersection improvement on S.R. 158 and C.R. 553/McDonald Road in the City of Douglas. The intent of the project is to add a center left turn lane at all four approaches at this intersection. The existing right-of-way on S.R.
|
Cobb
|
2010
|
6010
|
Richardson, Rick R.
|
Archaeological Assessment of Project STP-1700(3), Coffee County
|
The proposed project consists of the widening and reconstruction of SR 206/Perimeter Road. The project begins at the intersection of SR 32 and ends at the intersection of US 441/SR 31. The existing two-lane roadway will. be widened symmetrically to a five-lane roadway.
|
Houston
|
2010
|
6011
|
Richardson, Rick R.
|
Archaeological Assessment of Project STP-1704(3), Coffee County
|
The proposed project consists of the improvement of the intersection of SR 158/Baker Highway and Shirley Avenue in the city of Douglas. The project will begin approximately 106.7 m (350 ft) west of the intersection and will end approximately 213.4 m (700 ft) eastward.
|
Ware
|
2002
|