Back to top

Smith, Alex

Report Number Author(s) Title Abstract Summary County Year
12517 Jennings, Lisa, Smith, Alex Phase I Archaeological Survey for Road Improvements along SR 34 at I-85 in Coweta County, Georgia

The proposed project will construct a second right turn lane on the Interstate 85 (1-85) southbound exit ramp and signalize the dual right turn lanes from the 1-85 southbound exit ramp onto State Route (SR) 34. A right turn on red will be prohibited.

Coweta 2019
12568 Smith, Alex Phase I Archaeological Survey for SR 36 Connector Brownlee to Covington/Butts, Butts County, Georgia

The proposed project would construct a connector on the new location between the intersection of State Route (SR) 36/South Mulberry Street at Brownlee Road and East College Street at East College Drive in the city of Jackson, Georgia (see Figure 1).

Butts 2018
14224 Lewis, Clifford Thomas, Smith, Alex Phase I Archaeological Survey for the Replacement of Bridge 025-5016-0, CR 122/Humpback Road over Little Satilla River, Brantley County, Georgia

Edwards-Pitman, Inc.

Brantley 2020
14505 Smith, Alex Addendum Phase I Archaeological Survey of East Solomon Street at Spalding Street/Searcy Avenue in Spalding County, Georgia

The proposed project consists of intersection reconfigurations in downtown Griffin in Spalding County, Georgia (Figure 1).

Spalding 2021
14650 Trudeau, Mary F., Smith, Alex Phase I Archaeological Survey of Proposed Improvements and Widening of SR 5 from Old Flowers Road, South of McCaysville, Georgia to Copperhill, Tennessee – USACE Section

The Georgia Department of Transportation (GDOT) plans operations and maintenance (O&M) improvements to State Route (SR) 5 from Old Flowers Road at the northern terminus of GDOT P.I. No. 0017038, a separate GDOT project (formerly under P.I. No.

Fannin 2022
14651 LaForge, Travis B., Smith, Alex Addendum Phase I Archaeological Survey for Proposed Intersection Improvements for I-16 at CS 647/CS 2289/Chatham Parkway, Chatham County, Georgia – USACE Section 106 Report (SAS# 2020-00833)

The proposed project would reconfigure the Interstate (I)-16 Eastbound (EB) exit ramp at Chatham Parkway from a two-lane approach to a four-lane approach adding one additional left turn and one additional right 

Chatham 2022
Displaying 1 - 6 of 6