14044
|
Butler, C. Scott, Hobgood, Ronald E.
|
Archaeological Resources Survey for the Northwoods Loop Transmission Line, Gwinnett County, Georgia
|
On 31 December 2002 and 2 January 2003 an intensive archaeological resources survey was carried out for the proposed Northwoods Loop Transmission Line in Gwinnett County, Georgia.
|
Gwinnett
|
2003
|
14197
|
Long, Catherine, Butler, C. Scott
|
Phase I Archaeological Survey of Cartersville Airport Bartow County, Georgia
|
In September 2019, Brockington and Associates, Inc.
|
Bartow
|
2019
|
14200
|
Butler, C. Scott, Page, James M.
|
Phase III Data Recovery Excavations at Pikes Bluff (9GN199) St. Simons Island, Glynn County, Georgia
|
From January to April 2004, Brockington and Associates, Inc.
|
Glynn
|
2020
|
14201
|
Butler, C. Scott, Page, James M.
|
Archaeological Data Recovery at The Pikes Bluff Shell Midden (9GN200) St. Simons Island, Glynn County, Georgia
|
Phase III data recovery excavations took place at 9GN200 intermittently from June 2003 to March 2004.
|
Glynn
|
2020
|
14202
|
Butler, C. Scott, Perash, Rachel
|
A Phase I Archaeological Survey for a 38-Acre Portion of the Wallace Dam Project (FERC #2413) Hancock County, Georgia
|
In August 2020, Brockington and Associates, Inc. (Brockington) conducted a Phase I archaeological survey of the 38-acre Wallace Dam tract in Hancock County, Georgia. The project tract is located approximately 360 meters (m) north of Wallace Dam and 300 m east of Lake Oconee.
|
Hancock
|
2020
|
14205
|
Reynolds, Michael W., Butler, C. Scott
|
Cultural Resources Survey of the New Savannah Bluff Lock and Dam Fish Weir Tract Richmond County, Georgia
|
Between December 9 and 20, 2019 and January 13 and 17, 2020, Brockington and Associates, Inc. (Brockington) conducted a Phase I cultural resources survey and Phase II trench excavations on the New Savannah Bluff Lock and Dam tract in Richmond County, Georgia.
|
Richmond
|
2020
|
14440
|
Perash, Rachel, Butler, C. Scott
|
Cultural Resources Survey for the Proposed West Dallas Sewer Line, Paulding County
|
Between June and July 2021, CROY Engineering, LLC (CROY Engineering) contracted with Brockington and Associates, Inc. (Brockington) to conduct a Phase I cultural resources survey to document resources for the proposed West Dallas Sewer Line in Paulding County, Georgia.
|
Paulding
|
2021
|
14660
|
Stallings, Patricia F., Butler, C. Scott, Stewart, Rebecca M.
|
Phase I Cultural Resources Survey of a 2.5-mile section of the 115 kV Tugalo-Yonah Transmission Line and an Adjacent 25-acre Parcel and Assessment of Effects for the Yonah Hydroelectric Facility
|
Between June 7 and June 10, 2021, Brockington and Associates, Inc. (Brockington) conducted a cultural resources survey of approximately 2.5 miles of an existing 115kV transmission line located between Tugalo Dam and Yonah Dam in Habersham and Stephens Counties, Georgia.
|
Habersham
|
2021
|
14679
|
Butler, C. Scott
|
Assessment of Effects (AOE) for the Francis Plantation (9WG29)
|
The Vogtle Electric Generating Plant (VEGP) Transmission Line (TL) includes the Vogtle-Scherer 500 KV Line Route (V-STL) which begins at the VEGP and traverses westward through Burke, Jefferson, Washington, Putnam, Hancock, Baldwin, Jones, and Monroe Counties, Georgia.
|
Washington
|
2021
|
14683
|
Whitacre, Stacey R., Butler, C. Scott
|
Phase I Archaeological Survey of the Winder-Augusta Fiber Replacement Project
|
Between December 10, 2018 and March 6, 2020, Brockington and Associates, Inc. (Brockington) conducted a Phase I archaeological survey of the 137.1-mile (220.64-km) Winder-Augusta Fiber Optic Replacement Project corridor on behalf of Georgia Power Company (GPC).
|
Richmond
|
2020
|