Back to top

Butler, C. Scott

Report Number Author(s) Title Abstract Summary County Year
14044 Butler, C. Scott, Hobgood, Ronald E. Archaeological Resources Survey for the Northwoods Loop Transmission Line, Gwinnett County, Georgia

On 31 December 2002 and 2 January 2003 an intensive archaeological resources survey was carried out for the proposed Northwoods Loop Transmission Line in Gwinnett County, Georgia.

Gwinnett County, GA 2003
14197 Long, Catherine, Butler, C. Scott Phase I Archaeological Survey of Cartersville Airport Bartow County, Georgia

In September 2019, Brockington and Associates, Inc.

Bartow County, GA 2019
14200 Butler, C. Scott, Page, James M. Phase III Data Recovery Excavations at Pikes Bluff (9GN199) St. Simons Island, Glynn County, Georgia

From January to April 2004, Brockington and Associates, Inc.

Glynn County, GA 2020
14201 Butler, C. Scott, Page, James M. Archaeological Data Recovery at The Pikes Bluff Shell Midden (9GN200) St. Simons Island, Glynn County, Georgia

Phase III data recovery excavations took place at 9GN200 intermittently from June 2003 to March 2004.

Glynn County, GA 2020
14202 Butler, C. Scott, Perash, Rachel A Phase I Archaeological Survey for a 38-Acre Portion of the Wallace Dam Project (FERC #2413) Hancock County, Georgia

In August 2020, Brockington and Associates, Inc. (Brockington) conducted a Phase I archaeological survey of the 38-acre Wallace Dam tract in Hancock County, Georgia. The project tract is located approximately 360 meters (m) north of Wallace Dam and 300 m east of Lake Oconee.

Hancock County, GA 2020
14205 Reynolds, Michael W., Butler, C. Scott Cultural Resources Survey of the New Savannah Bluff Lock and Dam Fish Weir Tract Richmond County, Georgia

Between December 9 and 20, 2019 and January 13 and 17, 2020, Brockington and Associates, Inc. (Brockington) conducted a Phase I cultural resources survey and Phase II trench excavations on the New Savannah Bluff Lock and Dam tract in Richmond County, Georgia.

Richmond County, GA 2020
14440 Perash, Rachel, Butler, C. Scott Cultural Resources Survey for the Proposed West Dallas Sewer Line, Paulding County

Between June and July 2021, CROY Engineering, LLC (CROY Engineering) contracted with Brockington and Associates, Inc. (Brockington) to conduct a Phase I cultural resources survey to document resources for the proposed West Dallas Sewer Line in Paulding County, Georgia.

Paulding County, GA 2021
14660 Stallings, Patricia F., Butler, C. Scott, Stewart, Rebecca M. Phase I Cultural Resources Survey of a 2.5-mile section of the 115 kV Tugalo-Yonah Transmission Line and an Adjacent 25-acre Parcel and Assessment of Effects for the Yonah Hydroelectric Facility

Between June 7 and June 10, 2021, Brockington and Associates, Inc. (Brockington) conducted a cultural resources survey of approximately 2.5 miles of an existing 115kV transmission line located between Tugalo Dam and Yonah Dam in Habersham and Stephens Counties, Georgia.

Habersham County, GA 2021
14679 Butler, C. Scott Assessment of Effects (AOE) for the Francis Plantation (9WG29)

The Vogtle Electric Generating Plant (VEGP) Transmission Line (TL) includes the Vogtle-Scherer 500 KV Line Route (V-STL) which begins at the VEGP and traverses westward through Burke, Jefferson, Washington, Putnam, Hancock, Baldwin, Jones, and Monroe Counties, Georgia.

Washington County, GA 2021
14683 Whitacre, Stacey R., Butler, C. Scott Phase I Archaeological Survey of the Winder-Augusta Fiber Replacement Project

Between December 10, 2018 and March 6, 2020, Brockington and Associates, Inc. (Brockington) conducted a Phase I archaeological survey of the 137.1-mile (220.64-km) Winder-Augusta Fiber Optic Replacement Project corridor on behalf of Georgia Power Company (GPC).

Richmond County, GA 2020
Displaying 51 - 60 of 66