Back to top

Joseph, Joseph W.

Report Number Author(s) Title Abstract Summary County Year
3603 Joseph, Joseph W. Historical & Archaeological Investigations of a Corduroy Road Segment along US 80; Effingham & Chatham Counties, Georgia

Road construction for the widening of US 80 in Chatham County, Georgia, near the Effingham/Chatham County line, identified an area of corduroy road construction underlying the existing highway. Corduroy roads were made of logs, placed side by side to form a solid surface for traffic and transit.

Chatham County, GA 2006
3610 Joseph, Joseph W. Phase I Archaeological Survey of the Proposed Lithonia Industrial Boulevard Extension Project, DeKalb County, Georgia

This project would consist of extending Lithonia Industrial Boulevard, on new alignment, from a newly constructed interchange at Interstate 20 (I-20) to Evans Mill Road.

DeKalb County, GA 2006
3719 Joseph, Joseph W. The Phase I Archaeological Survey of the Proposed Cartersville Water Main Corridor

New South Associates conducted a Phase I survey of the proposed Cartersville water main corridor between June 22 and 27, 2006. The corridor was located west of downtown Cartersville and was approximately nine kilometers (5.6 miles) in length.

Bartow County, GA 2006
3740 Joseph, Joseph W. Addendum to the Phase I Archaeological Survey: Eisenhower Parkway Extension Alternative H Bibb County, Georgia

New South Associates has completed a Phase I Archaeological Survey of the proposed Eisenhower Parkway Extension, Alternative H.

Bibb County, GA 2006
3793 Joseph, Joseph W. Phase I Archaeological Survey of the Cannon Road Bridge over White Oak Creek

The project proposal calls for the replacement of the Cannon Road bridge over White Oak Creek. The project has a total length of 2,148.49 feet (654.86 meters).

Coweta County, GA 2006
3797 Joseph, Joseph W. Phase I Archaeological Survey of the Green Top Road Bridge over the CSX Railroad

The project proposal calls for the replacement of the Green Top Road bridge over the CSX Railroad. Due to the sharp crest of the current bridge, they are planning to lower the bridge and replace the steel Warren truss.

Coweta County, GA 2006
3800 Joseph, Joseph W., Warhop, Jennifer R. Phase I Archaeological Survey of the Lee Road and Interstate 20 Interchange, Douglas County, Georgia

The project proposal calls for the improvement of Lee Road where it intersects with Interstate 20 (Figure 1). Lee Road will be widened, and a new loop from Vulcan Drive to Sweetwater Industrial Boulevard will be constructed.

Douglas County, GA 2006
3831 Joseph, Joseph W. Phase I Archaeological Survey of Cross Streets of the US 27 Corridor, Troup County

The proposed project consists of the widening of 15 cross streets and construction of three cul-de-sacs associated with the widening of US 27 between Auburn and Whitesville Streets.

Troup County, GA 2006
3840 Joseph, Joseph W. Phase I Archaeological Survey Addendum of the Green Top Bridge Road over the CSX Railroad

The proposed project consists the replacement of the Green Top Road bridge over the CSX rail corridor. The project also involves alteration to the eastern and western approaches to the bridge. The project corridor is approximately 1,419 feet (432.5 meters) in length.

Coweta County, GA 2007
3841 Joseph, Joseph W. Phase I Archaeological Survey Addendum of the Cannon Road Bridge over White Oak Creek

The proposed project consists the replacement of the Cannon Road bridge over White Oak Creek. The project also involves alteration to the eastern and western approaches to the bridge. The project corridor is approximately 1,440 feet (439 meters) in length.

Coweta County, GA 2007
Displaying 161 - 170 of 297