Back to top

Reed, Mary Elizabeth

Report Number Sort ascending Author(s) Title Abstract Summary County Year
9995 Yallop, Robert, Reed, Mary Elizabeth Architectural Assessment of Two World War I Era Aviation Hangars, Lawson Army Airfield, Georgia and Alabama

An architectural assessment of two aviation hangars (Buildings 303 and 304), Lawson Army Airfield, Fort Benning, Georgia and Alabama, was conducted by New South Associates in October, 1996.

Chattahoochee 1996
9527 Reed, Mary Elizabeth Phase I Historic Structures Survey, Proposed Dresden-Heard 500 kV Transmission Line

New South Associates conducted a Phase I historic resources survey of the proposed Dresden-Heard 500 kV Transmission Line in Coweta and Heard counties in April 2010.

Coweta 2010
8547 Joseph, Joseph W., Banguilan, Alvin J., Hamby, Theresa M., Reed, Mary Elizabeth Phase I Archaeological Survey of the Proposed Intersection Improvement Area at State Route t 6 and Old Carrollton Road in Coweta County, Georgia

New South Associates conducted a Phase I archaeological survey of the proposed intersection improvements at Alternate U.S. Highway 27 /State Route 16 at Old Carrollton Road in Coweta County, Georgia. Archaeological field investigations took place on March 28, 2002.

Pulaski 2014
8544 Joseph, Joseph W., Banguilan, Alvin J., Matternes, Matt, Reed, Mary Elizabeth, Hamby, Theresa M. Phase I Archaeological Survey of the Proposed Intersection Improvement Area at State Route 14 at Herring Road and Edgeworth Road Coweta County, Georgia

New South Associates conducted a Phase I archaeological survey of the proposed intersection improvements at U.S. Highway 29 /State Route 14 at Herring Road and Edgeworth Road in Coweta County, Georgia. Archaeological field investigations took place on March 28, 2002.

Walton 2009
8539 Wheaton, Thomas R., Reed, Mary Elizabeth, Guan, Garry X., Van Voorhies, Christine West Cobb Loop Cultural Resources Survey, Cobb County, Georgia

New South Associates, Inc. surveyed the approximately six mile long, 300 foot wide, West Cobb Loop corridor with a two person crew between July 19 and 23, 1993. The area surveyed closely follows the originally proposed Alternate 1, which runs mostly along Noses Creek.

Henry 2013
8505 Reed, Mary Elizabeth, Tyson, Jackie H. Phase II Study, Proposed Dresden-Heard 500 kV Transmission Line

In November 2011, New South Associates conducted a Phase 2 Historic Resources Survey of the proposed Dresden-Heard 500 kV Transmission Line in Coweta and Heard counties.

Hall 2015
6025 Reed, Mary Elizabeth, Hamby, Theresa M. Phase 1 Archaeological Survey of the Chattahoochee Connector Water Main Replacement, Chattahoochee National Recreation Area, Cobb County, Georgia

New South Associates conducted a Phase I archaeological survey of the proposed Chattahoochee Connector water main replacement corridor on August 10, 11, 18 and 24, 1995.

Whitfield 2001
5956 Reed, Mary Elizabeth An Archaeological Survey of the US 280/ SR 30/ Main Street HPP Streetscape Improvements Project, Claxton, Evans County, Georgia

The proposed project would consist of the replacement of an existing concrete sidewalk 580 meters (1,903 ft.) in length along the north side of Main Street (US 280) from Broad Street to Peters Street in Claxton, Georgia.

Clarke 1992
5282 Reed, Mary Elizabeth, Wheaton, Thomas R. Shine's Corner at Traveler's Rest, A Frontier Community

This report discusses the results of a cultural resources data recovery project conducted at the abandoned frontier community of Traveler's Rest, now in the city limits of Montezuma, Macon County, Georgia.

Liberty 1993
2077 Reed, Mary Elizabeth, Hamby, Theresa M. Phase I Archaeological Survey of The Gwinnett Civic Center Expansion, Gwinnett County, Georgia

A Phase I archaeological survey of the approximately 40 acres of the Gwinnett County Civic Center Expansion was surveyed by New South Associates on December 5, and 6, 2000.

Gwinnett 2001
Displaying 1 - 10 of 24