Back to top

Moss, Richard A.

Report Number Sort ascending Author(s) Title Abstract Summary County Year
14630 Moss, Richard A., Plent, Samuel Phase I Archaeological Survey of the Proposed SR 83 Connector, Walton County, Georgia - USACE Section 106 Report (SAS #2018-00422)

The proposed project would construct a 7.56-kilometer (km) (4.7 mile [mi]) long connector on a new location that would provide an alternate route around the historic downtown City of Monroe, Georgia (Figure 1).

Walton 2022
14538 Moss, Richard A. Addendum to the Phase I Archaeological Survey of the Proposed SR 316/SR 8/US 29 at CR 929/ Oconee Connector Improvements Project in Oconee County, Georgia

Edwards-Pitman, Inc.

Oconee 2021
14509 Moss, Richard A. Phase I Archaeological Survey of Proposed Improvements at SR 53/Hog Mountain Road and Snows Mill Road, Oconee County, Georgia

Edwards-Pitman, Inc.

Oconee 2021
14473 Moss, Richard A., Bright, Kaitlyn Addendum to Phase I Archaeological Survey for Proposed Improvements and Widening to DeRenne Avenue, Chatham County, Georgia

Chatham 2021
14463 Bright, Kaitlyn, Moss, Richard A. Phase I Archaeological Survey of the Proposed Bridge Replacement on SR 80 over the Little River in McDuffie, Warren, and Wilkes Counties

The proposed project would consist of the replacement of the Georgia Department of Transportation (GDOT) Bridge, Structure ID 189-0031-0, on State Route (SR) 80 over the Little River in McDuffie, Warren, and Wilkes counties (Figure 1).

McDuffie 2021
14456 Moss, Richard A. Phase I Archaeological Survey of Proposed Improvements at SR 53/Hog Mountain Road and CR 99/Rays Church Road and CR 516/Malcolm Bridge Road, Oconee County, Georgia

Edwards-Pitman, Inc.

Oconee 2021
14222 Moss, Richard A., Hitt, Kaitlen Phase I Archaeological Survey of Proposed Bridge Reconstruction, CR 35/Bethesda Church Road at Indian Creek (Structure ID 045-5007-0), Carroll County, Georgia

On May 13 and May 30, 2019, Edwards-Pitman, Inc.

Carroll 2019
13733 Woodliff, John Dylan, Moss, Richard A. Phase I Archaeological Survey of Proposed Improvements and Widening of State Route (SR) 5 from SR 515 in Blue Ridge to Approximately Old Flowers Road, Fannin County, Georgia

Edwards-Pitman Environmental, Inc.

Fannin 2018
13715 Moss, Richard A. Addendum Phase I Archaeological Survey of the Proposed Reconstruction of the Bridge on SR 18 at CS X Railroad in Durand, Meriwether County, Georgia

Edwards-Pitman Environmental, Inc. (EPEI), under a contract with Atkins North America, conducted additional Phase I archaeological survey for the Georgia Department of Transportation (GDOT) project to reconstruct the State Route (SR) 18 bridge at the CSX railroad in Durand, Georgia (Project No.

Meriwether 2016
12808 Moss, Richard A., Sipe, Ryan O. Geophysical Survey Report for Addendum Phase I Archaeological Survey of Atlanta Beltline Southside Trail, Fulton County, Georgia

On October 10, 2016, Edwards-Pitman Environmental, Inc. (EPEI) conducted a supplemental ground penetrating radar (GPR) investigation in order to further investigate buried historic streetcar resources potentially affected by Atlanta BeltLine, Inc.’s (ABI’s) proposed Southside Trail (Figure 1).

Fulton 2016
Displaying 1 - 10 of 38