Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
6415 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-190-1(17), Gwinnett/Hall Counties

The proposed project would consist of the reconstruction and resurfacing of SE--147 in Hall and Gwinnett Counties. The proposed project would begin at the bridge over 1-985 (MP 4.16) and would end at the intersection of SR 211 (MP 1.10).

Cook County, GA 1996
6416 Bowen, William R. Archaeology Assessment of Project FR-078-1(12), ct2, Gwinnett County

This project proposes the extension of S.R. 124/Scenic Highway from Henry Glower Blvd. to Lenora Church Road, a distance of 0.28 miles.

Crisp County, GA 1996
6417 Archaeological Assessment of Project FR-061-1(83), Gwinnett County

This project proposes the widening of U.S. 78/S.R. 10 from Rockbridge Road east to the proposed intersection of Snellville Bypass. A corridor 200 feet wide was surveyed for 4.7 miles.

Tift County, GA 1996
6418 Entorf, Robert F. Archaeology Assessment of Project MR-9286(5), Gwinnett County

The proposed project would widen Beaver Ruin Road from Indian Trail Road easterly to a point approximately 1,000 feet northeast of the southbound exit ramp of the 1-85 interchange. Existing right-of-way is 130 feet. An additional 20 feet of right-of-way would be required.

Cook County, GA 2006
6419 Bowen, William R. Archaeology Assessment of Project FR-061-1(89), Dekalb and Gwinnett Counties

This project proposes to widen S.R.10/U.S.78 from Stone Mountain Park Interchange to East Park Place Boulevard. The existing right-of-way is approximately 230 feet and the required right-of-way is variable up to approximately 600 feet at the proposed interchange.

Tift County, GA 2006
6420 Archaeological Assessment of Project EDS-640(2) Ext. ,Gwinnett County

The proposed project would construct on new location a connector between 1-85 and Alcovy Road in Gwinnett County.

Cook County, GA 2003
6421 Entorf, Robert F. Archaeological Assessment of Project IR-85-2(119), Gwinnett County

The proposed project would construct one northbound and one southbound auxiliary travel lane on 1-85 between Beaver Ruin Road and Steve Reynolds Boulevard. In addition, a half diamond interchange would be constructed on the south side of Steve Reynolds Boulevard.

Cook County, GA 2001
6422 Entorf, Robert F. Archaeological Assessment of Project FR-189-1(15), Gwinnett County

The proposed project would reconstruct and widen S.R.120 between Duluth and Lawrenceville. The project as proposed would begin at North Brown Road just east of 1-85 then would extend easterly along S.R. 120 to S.R. 316 just west of the city limits of Lawrenceville.

Cook County, GA 2000
6423 Entorf, Robert F. Archaeological Assessment of Project FR-013-1(55), Gwinnett County

The proposed project would reconstruct and widen S.R.13/U.S.23/ Buford Highway in Buford. The project as proposed would begin at the intersection of S.R.13 Loop then would extend northeasterly along existing S.R.13/U.S.23 to the intersection at which S.R.13 Loop ties back into S.R.13/U.S.23.

Cook County, GA 1999
6424 Paglione, Teresa L. Archaeological Assessment of Project IR-85-2(126), Gwinnett County

The proposed project consists of the reconstruction of the interchange and the replacement of the bridge at 1-85 and SR 317. All four ramps would be moved further from the SR 317 bridge over 1-85; the limits of access along SR 317 would be extended to approximately 150 feet from ramp returns.

Lowndes County, GA 1999