Back to top

Report Abstracts

Report Number Author(s) Title Abstract Summary County Year
14454 Carey, Travis, Jennings, Lisa Phase I Archaeological Survey for State Route 520/US 280 at County Road 66/ Red Hill

The proposed project fixes a washout area adjacent to State Route (SR) 520 located about 6.4 kilometers (km) (4 miles [mi]) north of Richland in Stewart County, Georgia.

Stewart 2021
14455 Pokrant, Marie E., Wise, Robert P. Phase I Archaeological Survey of the SR 74 at SR 42 Roundabout, Monroe County, Georgia

To improve safety and traffic flow, GDOT proposes to improve the intersection of SR 74 at SR 42 with a one-lane roundabout with 12-foot lanes in both directions along SR 74. SR 74 is classified as a Rural Minor Arterial, and SR 42 is a Rural Major Collector.

Monroe 2021
14456 Moss, Richard A. Phase I Archaeological Survey of Proposed Improvements at SR 53/Hog Mountain Road and CR 99/Rays Church Road and CR 516/Malcolm Bridge Road, Oconee County, Georgia

Edwards-Pitman, Inc.

Oconee 2021
14457 Quirk, Phillip W. Phase I Archaeological Resource Survey of the Proposed Expansion of CR 422/Jeff Davis Road at Ten Mile Creek Upson County, Georgia

On October 12 and 13, 2020, HNTB completed a Phase I archaeological resources survey for a proposed bridge replacement of County Road (CR) 422/Jeff Davis Road over Ten Mile Creek, in Upson County, Georgia.

Upson 2021
14458 Hinson, Lindsey Phase I Archaeological Survey in Advance of the Bridge Replacement on CR 229/Valentine Industrial Parkway over I-85, Jackson County, Georgia

Edwards-Pitman, Inc. (EP) completed a Phase I archaeological survey for the County Road 229 (CR 229)/Valentine Industrial Parkway over Interstate 85 (I-85) bridge replacement project in Jackson County, Georgia (PI No. 0016523 and HP No. 210428-001).

Jackson 2021
14459 Blackwelder, Jon R. Phase I Archaeological Survey for a Proposed Bridge Replacement on CR 197/Big Cedar Road at Rocky Creek, Wilkes County, Georgia

The proposed project would replace the existing bridge (Structure ID 317-5034-0) on County Road (CR) 197 (Big Cedar Road) over Rocky Creek in Wilkes County, Georgia.

Wilkes 2021
14460 Southard, Elizabeth A Phase I Archaeological Survey for a Proposed CS 223/Portal Highway at Fifteenmile Creek and Overflow, Candler County, Georgia

The proposed projects would replace two existing bridge structures on County Road (CR) 223 over Fifteenmile Creek (bridge Structure ID 043-0031-0) and its adjacent overflow (bridge Structure ID 043-0030) in Candler County, Georgia. These projects are associated with PI Nos.

Candler 2021
14461 Parking, Sara Mackenzie A Phase I Archaeological Survey for a Bridge Replacement on CR 222/CR 954/County Line Rd. at Potato Creek, Spalding and Lamar Counties

The proposed project would replace the existing two-lane 60 foot-long bridge (serial ID 255-0036-0) on County Road (CR) 222/CR 954/County Line Road over Potato Creek, 3 miles southeast of Griffin, GA. The typical section of the replacement bridge is yet to be determined.

Spalding 2021
14462 Gengenbach, Barbara, Green, William, Brown, Jonathan, Gordon, Marnie Phase I Archaeological Survey of the East Hightower Trail Sidewalk Installation

Terracon Consultants, Inc., (Terracon), on behalf of Keck and Wood, Inc., and the Georgia Department of Transportation (GDOT) has completed a Phase I Archaeological Survey for a proposed sidewalk installation on East Hightower Trail in Social Circle, Walton County, Georgia (GDOT

Walton 2021
14463 Bright, Kaitlyn, Moss, Richard A. Phase I Archaeological Survey of the Proposed Bridge Replacement on SR 80 over the Little River in McDuffie, Warren, and Wilkes Counties

The proposed project would consist of the replacement of the Georgia Department of Transportation (GDOT) Bridge, Structure ID 189-0031-0, on State Route (SR) 80 over the Little River in McDuffie, Warren, and Wilkes counties (Figure 1).

McDuffie 2021