6245 Duff, Eric Anthony Archaeological Assessment of Project NH-75-1(204), Cook County

Project NH-75-1(204) would widen 1-75 from two northbound and southbound lanes to three lanes in Cook County. The proposed project on 1-75 would begin at the Cook County Line then continue northerly to an end point just north of SR 37.

Richmond 1998
6248 Duff, Eric Anthony Archaeological Assessment of Project IM-75-1(226), Cook County

The proposed project consists of building renovations and parking lot e.,x,ansions- a est Areas 5 and 61n Cook County. Rest Area # 5 is located on the east side of 1-75 at milepoint 15.25. Rest Area # 6 is located on the west side of 1-75 at milepoint 16.50 south of Lenox, Georgia.

Muscogee 2010
6249 Duff, Eric Anthony Archaeological Assessment of Project MAIM-75-1(226), Cook County

The proposed project consists of Phase II building renovations and parkinq lot expansions at Rest Areas 5 and 6 in Cook County. Rest Area # 5 is located on the east side of I-7 at milepoint 15.25. Rest Area # 6 is located on the west side of 1-75 at milepoint 16.50.

Glynn 2001
6250 Duff, Eric Anthony Archaeological Assessment of Project IM-75-1(235), Cook County

The proposed project would install an automated adverse visibility warning system in both directions on 1-75 from MP 34 to MP 36 in Cook County.

Glynn 1973
6251 Duff, Eric Anthony Archaeological Assessment of Project IM-75-1(243), Cook County

The proposed project would rehabilitate the existing outside shoulder of 1-75 in Cook County. The inside 1.8 meters (6 feet) of the 3 meters (10 feet) paved shoulder would be milled down and resurfaced.

Long 1973
6270 Duff, Eric Anthony Archaeological Assessment of Project IM-95-1(144), Glynn County

The proposed project would consist of building renovations_ and >arki.-ia lot expansions at Rest Area 105 in Glynn County. Rest area 105 is located on the east side of 1-95 between exits 8 and 9 north of Brunswick.

Clayton 2009
6274 Duff, Eric Anthony Archaeological Assessment of Project NH-IM-95-1(117), Glynn County

Project NH-IM-95-1(117) would widen 1-95 from two northbound and southbound lanes to three lanes in Glynn County. The proposed project on 1-95 would begin at US 341 then continue northerly to an end point at the McIntosh County Line. The existing right-of-way on 1-95 is approximately 300 feet.

Forsyth 2009
6301 Duff, Eric Anthony, McIntosh, Paul Archaeological Reassessment of Project STP-001-5(60), Cobb County

The original proposed project would consist of reconstruction of median crossovers along SR 3/US 41 at various locations in Cobb County. The project begins approximately 1.12 miles within the city limits of Kennesaw extending northward to the Bartow County Line.

Cobb 1982
6326 Duff, Eric Anthony Archaeological Assessment of Project STP-9023(3), Cobb County

The proposed project would widen SR 6 Business to provide right and left turn lanes in and out of Powder Springs Road/CR 4510. The project would also realign SR 6 Business so that it intersects Brownsville Road/CR 2118 at 90 degrees.

Wilcox 1985
6332 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project CM-575-1(34), Cobb and Cherokee counties

Project CM-575-1(34) would install fiber optic cables, traffic surveillance and vehicle detection cameras, and changeable message signs on portions of 1-75 and 1-575.

Chattahoochee 1993