Report Number Author(s) Title Abstract Summary County Year
5828 Duff, Eric Anthony, Fleming, Sherry Archaeological Assessment of Project NH-17-2(57), Floyd County

An archaeological survey (Level I) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Pr

Fulton 1997
5829 Duff, Eric Anthony Archaeological Assessment of Project BHF-017-2(55), Floyd County

An archaeological survey (Level I) was conducted in accordance with "GDOT/FHWA Cultural Resource Survey Guidelines" developed by the GDOT Staff Archaeologists in consultation with DNR Historic Preservation Section Staff and concurred in by the Federal Highway Administration and State Historic Pr

Fulton 1997
5834 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Project STP-0001-00(575), Floyd County

The proposed project would consist of reconstruction of median crossovers along SR 53 at various locations in Floyd County. The project begins at the SR 1 Loop/East Rome Bypass and proceeds northward to M.P. 34.36 in Bartow County. The total length of the project is 9.93 miles.

Fulton 1996
5836 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project NH-012-1(102)LP, Floyd County

Project NH-012-1(102)LP would add left turn lanes to CR 796 at the intersection with SR I Loop in Floyd County, Georgia. The proposed project would begin on CR 796 approximately 760 feet east of the intersection with SR 1 Loop and terminate approximately 840 feet west of the intersection.

Fulton 1996
5847 Duff, Eric Anthony, Fleming, Sherry Archaeological Assessment of Project STP-00TS(19), Clarke County

The proposed project will re e existing traffic sii n. s stem in the city of Athens. This will include 25 intersections along SR 10/Broad Street, Clayton Street, Washington Street, Hancock Street, and Dougherty Street.

Fulton 1994
5851 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project STP-0001-00(583), Clarke and Madison Counties

The proposed project would consist of reconstruction of median crossovers along SR 8/U.S. 29 at various locations in Clarke and Madison Counties. The project begins at the CR 203/Athena Road intersection and proceeds northerly to CR 422/Old SR 106 intersection in Madison County.

Douglas 2005
5852 Duff, Eric Anthony, Pietak, Lynn Marie Addendum to An Archaeological Survey of Seven Intersection Improvements in Clarke County, Georgia

I, the Principal Investigator: Lynn Marie Pietak PhD., do hereby certify that the Area of Potential Effect (as described on page 1 of this form) for GDOT Project STP-0005-00(922) has been thoroughly surveyed for archaeological resources and that no such resources were located or identified.

Clarke 2007
6123 Duff, Eric Anthony Archaeological Reassessment of Project BRF-082-1 (15), Murray County

Project BRF-082-1(15) would widen the existing bridge structure over the L & N Railroad on SR 52 in Murray County.

Wheeler 2010
6126 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Reassessment of Project BRF-082-1 (15), Murray County

Project BRF-082-1(15) would widen the existing roadway and bridge structure over the L & N Railroad on SR 52 in Murray County. Also, there would be a relocation of Holly Street as it approaches SR 52 from the south.

DeKalb 2010
6127 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project STP-213 (13), Murray County

Project STP-213(13) would construct a new bridge on Federal Road/CR 19 over the CSX railroad in Chatsworth, Georgia. The proposed project would also include a bike lane on Federal Road/CR 19. The existing right-of-way is 80 feet. The required right-of-way varies with a maximum of 150 feet.

Fulton 2010