Back to top

Duff, Eric Anthony

Report Number Author(s) Title Abstract Summary County Year
6128 Duff, Eric Anthony, Fleming, Sherry Archaeological Assessment of Project BHF-082-1 (15), Murray County

Project BHF-082-1(15) in Murray County will widen the existing structure over the L & N Railroad on SR 52. The proposed project begins approximately 116 m Wit) west of the existing railroad and ends approximately 152 m (500 ft) east of the existing railroad at Holly Street.

Heard 2010
6138 Duff, Eric Anthony Archaeological Assessment of Project STP-069-2(8), Wilkes County

The proposed project would. consist of plant mix resurfacing of state route 47 beginning at MP 9.88 and ending at MP 20.29. All disturbance will be confined to the area of the existing pavement.

Coffee 1997
6142 Duff, Eric Anthony Archaeological Assessment of Project EDS-545 (47), Wilkes County

The proposed project would widen and, reconstruct SR 17 in Wilkes County, beginning south of Tignall at milpost 14.48 and continuing north to milepost 16.71, and also north of Tignall at milepost 23.88 and continuing north to an end point at milepost 26.28.

Irwin 1996
6171 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project STP-BRF-30-2 (42), Wilcox County

STP-BRF-30-2(42) would replace the existing bridge over the Alapaha River tributary located on US 280/SR 30 in Wilcox County. The bridge is approximately 1.30 miles east of Seville, Georgia.

Walker 2001
6172 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Assessment of Project STP-BRF-30-2 (41), Wilcox County

STP-BRF-30-2(41) would replace the existing bridge over the Alapaha River tributary located on US 280/SR 30 in Wilcox County. The bridge is located 0.80 mile east of Seville, Georgia. The total length for the project is 3300 feet. The existing right-of-way is 100 feet.

Cobb 1996
6173 Duff, Eric Anthony, Lotti, Teresa Ann Archaeological Reassessment of Project STP-BRF-30-2 (41)

STP-BRF-30-2(41) would replace the existing bridge over the Alapaha River tributary located on US 280/SR 30 in Wilcox County. The bridge is located 0.80 mile east of Seville, Georgia. The project was subjected to a previous survey by Teresa Lotti in 2001 (HPD# HP010820-007).

Walker 2001
6189 Duff, Eric Anthony, Richardson, Rick R. Archaeological Survey and Evaluation of the Proposed Buford Retail Center Development Wetland Mitigation Site Gwinnett County Georgia

A reconnaissance archaeological survey was conducted within an approximately 7.61 hectare (18.80 acre) tract in Gwinnett County, Georgia, for a proposed retail development center wetland mitigation site during October of 1996.

Cherokee 1999
6191 Duff, Eric Anthony, McIntosh, Paul Archaeological Assessment of Utility Infrastructure Improvements at SR 59 and SR 51, Franklin County

The proposed project would provide permanent easements for water line placement along the northeast quadrant of the SR 59/SR 51 intersection. Location #1 would provide an approximately 400' X 20' permanent easement oriented in a northwesterly direction from SR 59.

Gwinnett 2009
6194 Duff, Eric Anthony, Fleming, Sherry Archaeological Assessment of Project BLDG-DST1-95(35), Franklin County

The proposed project would construct a 12.2 x 22.9 meter (40 x 75 foot) Area Engineer's Office on CR 209/Andrews Road near the Interstate 85/State Route 320 interchange just outside of Carnesville. All construction will be done within the limits of GDOT property.

Lowndes 2009
6196 Duff, Eric Anthony Archaeological Assessment of Project IM-85-2(180) Franklin County

Project IM-85-2(180) would connect Safety Rest Area # 81 along the 1-85 north corridor to existing water and sewer facilities in Franklin County.

Washington 2009
Displaying 291 - 300 of 695