Back to top

Keepler, Harvey

Report Number Author(s) Title Abstract Summary County Year
4989 Keepler, Harvey, Entorf, Robert F. Archaeology Assessment of Project IR-75-1(165), Houston County

No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.

Houston 1987
6945 Keepler, Harvey Permission Request for Archaeological Survey of Site 9JS1 (Camp Lawton) Located in Magnolia Springs State Park; GDOT Project EDS-565 (11), P.I. No. 222550, Jenkins County, Georgia; HP960712-001

As a result of design modifications and changes, the Georgia Department of Transportation (GDOT) currently is re-evaluating project EDS-565(11), Jenkins County, Georgia. Portions of the proposed project are within the boundaries of Magnolia Springs State Park.

Jones 1977
7178 Keepler, Harvey Archaeological Assessment of Project MR-3900(1), Washington County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project MR-3900(1), Washington County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NR

Monroe 1997
8320 Keepler, Harvey Abbreviated Archaeological Draft Report; GDOT Project STP-0000-00(839); P.l. No. 0000839; Proposed Expansion of the NaviGAtor System, Various Southeast Counties, Georgia

In compliance with Section 106 of the National Historic Preservation Act of 1966 (as amended), project STP-0000-00(839) was surveyed with respect to archeological resources, especially those on or eligible for inclusion in the National Register of Historic Places.

Rabun 2012
9239 Keepler, Harvey Addendum to An Archeological Survey of the Replacement on SR 135 Bridge over Pudding Creek, Atkinson County, Georgia

On August 30, 200 Southeastern Archeological Services conducted a Phase I intensive cultural resources survey for the replacement of the SR 135 bridge over Pudding Creek.

Atkinson 2002
9411 Keepler, Harvey Bridge Replacement on S.R. 105 over Middle Fork Broad River Banks County, Georgia

GDOT Project BRST-0885(3) is on the National Highway System (NHS) and is partially federally funded. Therefore, Section 106 compliance is being processed through the Federal Highway Administration (FHW A).

Banks 2001
12654 Keepler, Harvey Categorical Exclusion Project PPL-22(50) Hancock County

Project PPL-22(50) located in Hancock county would provide two passing lanes on an existing two-lane section of SR 22 southwest of Sparta. Passing Lane number one would be constructed on the north side of the roadway between MP 9.9 and MP 11.1 and would benefit westbound traffic.

Hancock 1989
13202 Keepler, Harvey Special Provision for Construction Contract: Project STP-M000-00(091) PI No. M000091 Bridge Pile Rehabilitation District 2

The following Special Provisions are requested for the construction contract on the above referenced project and shall appear as notations on the applicable plan sheet.

Screven 2000
13360 Keepler, Harvey Archaeological Assessment of Project PR-197-1(2610, Sumter County

The project consists of paving of two feet of existing shoulder on each side of CR 197 within the proposed project limits and resurfacing the roadway for a total length of 0.56 miles, all within existing rights-of-way.

Sumter 2001
Displaying 1 - 9 of 9