Back to top

Pomfret, James

Report Number Author(s) Title Abstract Summary County Year
4544 Pomfret, James Archaeological Reevaluation of Project CSSTP-0007-00(006), Fayette County

The proposed project would improve the intersection of SR 85 at CR 126/Bernhard Road. The proposed project would consist of the addition of left and right turn lanes on SR 85 in both directions; left turn lanes would be added on CR 126Bernhard Road in both directions.

Fayette 2009
4557 Pomfret, James Archaeological Reevaluation of Project EDS-545(14)(17)(18), Toombs/Emanuel Cos.

The proposed project would widen a 13 mile section of US 1/SR4 in Toombs and Emanuel Counties. The project corridor begins at the northern city limits of Lyons and extends north to the intersection of US 1/SR4 and 1-16. Existing right-of-way on US 1/SR4 is 100 feet.

Emanuel 2009
4559 Pomfret, James Archaeological Reevaluation of Project BR-0000-00(683), Gordon/Murray Counties

The proposed project would replace the structurally deficient bridge on CR 143/County Line Road over Polecat Creek in Gordon/Murray Counties. The existing bridge would be replaced with a 80' x 28' structure approximately 100 feet south of the current alignment.

Gordon 2009
4629 Pomfret, James Archaeological Reevaluation of Projects EDS-441(47)(48)(49)(46)(41), Echols, Clinch, and Atkinson Counties

The proposed projects would widen US 441 from the Florida state line to Pearson, Georgia. The proposed projects are approximately 60 miles in length.

Echols 2002
4630 Pomfret, James Archaeological Survey of the Jerome Crosby Wetland Mitigation Tract, STP-0004-00(266), Atkinson County

The Jerome Crosby Wetland Mitigation Tract is located just west of Willacoochee in Atkinson County, Georgia. The proposed wetland/stream mitigation site is approximately 200 acres in size and is located between US 82 and the Alapaha River.

Atkinson 2002
4632 Pomfret, James Archaeological Survey of Project QR-44, Atkinson County

The proposed project would tie Dasher Street into State Route 520/U.S. 82, widen Dasher Street, and add an accel lane to Railroad Avenue. Dasher Street would be extended on new location approximately 100 feet north and would tie into State Route 520/U.S. 82, creating a new intersection.

Atkinson 1999
4641 Pomfret, James Archaeological Survey of Project STP-0001-00(155), Bacon County

The proposed project would install a new traffic signal and upgrade the signing and marking at the intersection of State Route 32 and State Route 4 Alt in the town of Alma, Georgia. The existing right-of-way on SR 32 is 60 feet and the existing right-of-way of SR 4 Alt. is 80 feet.

Bacon 2000
4656 Pomfret, James Archaeological Survey of Project BHF-131-1(11), Baker County

The proposed project would replace the existing bridge over Ichawaynochoway Creek on SR 91 in Baker County. The proposed bridge would be constructed on a new alignment south of the existing bridge. The existing right-of-way is 100 feet.

Baker 1996
4663 Pomfret, James Archaological Survey of Project STP-004-2(38), Baldwin County

The proposed project proposes to reconstruct and improve the intersection of SR 22/24 and CR 472 approximately 1.2 miles east of the city limits of Milledgeville.

Baldwin 1999
4702 Pomfret, James Archaeological Survey of Project IM-OOMS(331), Bartow County

The proposed project would reconstruct five existing asphalt exit ramps on 1-75 in Bartow County. The exit ramps are located at CR 397, Red Top Mountain Road, SR 113, SR 20, and Glade Road. On 1-75 the southbound exit ramp at SR 20 will be extended to the SR 113 interchange.

Bartow 2000
Displaying 91 - 100 of 253