3017 Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of the Proposed Bridge Replacement: SR 1/US 27 over Mountain Creek, Harris County, Georgia

Original Description: the proposed bridge would be constructed on the existing roadway alignment and would be approximately 120 feet long and 44 feet wide. The new bridge would accommodate two 12-foot travel lanes and two 10-foot shoulders.

Harris 2005
3022 Pietak, Lynn Marie Addendum to Archaeological Survey for the Proposed Replacement of the SR 11 Bridge over Marbury Creek, Barrow County, Georgia

The proposed project would replace the structurally deficient bridge with a new bridge on existing alignment. The new bridge would be approximately 44 ft wide and 180 ft long, and accommodate two 12-ft travel lanes and two 10-ft paved shoulders.

Barrow 2005
3027 Pietak, Lynn Marie Phase I Archaeological Survey of Panola Road at I-20 Improvements Project Area, DeKalb County, Georgia

The project is an interchange improvement project at Panola Road and Interstate 20. The improvements extend along 1-20 approximately 0.47 miles west of the interchange to 0.09 miles east of the interchange beginning at mile log 70.8 and ending at mile log 71.36.

DeKalb 2005
3030 Pietak, Lynn Marie Addendum to Phase I Archaeology Survey of SR 81 at Racetrack Road, Henry County, Georgia

Original: The proposed project is located at the intersection of SR 81 and CR 376/Racetrack Road. The proposed project length is approximately 0.3 mile.

Henry 2005
3038 Silliman, Garrett W., Pietak, Lynn Marie Addendum to Intensive Archaeological Survey of the Proposed Big Horse Creek Bridge Replacement, Telfair County, Georgia

In February 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted additional survey at the site of the proposed bridge replacement over Big Horse Creek, Telfair County, Georgia. The total length of the redesigned project is 0.50 miles.

Telfair 2005
3039 Silliman, Garrett W., Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of CR 781/Staten Road over the Withlacoochee River, Lowndes County, Georgia

In January and February 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted additional survey at the site of the proposed bridge replacement over the Withlacoochee River, Lowndes County, Georgia.

Lowndes 2004
3042 Silliman, Garrett W., Pietak, Lynn Marie Phase I Archaeological Survey of the Proposed East Hiram Parkway Project area, Paulding County, Georgia

During November 2004, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the East Hiram Parkway project. The total length of the project is approximately 2.7 miles.

Paulding 2005
3053 Silliman, Garrett W., Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 268 over Hall's Creek, Coffee County, Georgia

A short form for negative findings for an addition to Phase I Archeological Survey of SR 268 over Hall's Creek, Coffee County, Georgia. The project is located on the Broxton South Quadrangle.

Coffee 2005
3054 Silliman, Garrett W., Pietak, Lynn Marie Addendum to the Phase I Archaeological Survey of SR 144 over Watermelon Creek, Tattnall

Original project description: The proposed project would replace the existing bridge over Watermelon Creek with a two-lane bridge on new alignment. The proposed alignment would be located north of the existing bridge with a centerline-to-centerline offset of approximately 60 feet.

Tattnall 2005
3058 Silliman, Garrett W., Pietak, Lynn Marie Addendum to Phase I Archaeological Survey of SR 90 over Little House Creek, Ben Hill County, Georgia

The project is located approximately seven miles north of Fitzgerald, Georgia. The project would begin approximately 900 feet southeast of Little House Creek, and end approximately 1,150 feet northwest of Little House Creek. The project would be approximately 2,050 feet long (0.39 mile).

Ben Hill 2005