3017
|
Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey of the Proposed Bridge Replacement: SR 1/US 27 over Mountain Creek, Harris County, Georgia
|
Original Description: the proposed bridge would be constructed on the existing roadway alignment and would be approximately 120 feet long and 44 feet wide. The new bridge would accommodate two 12-foot travel lanes and two 10-foot shoulders.
|
Harris
|
2005
|
3022
|
Pietak, Lynn Marie
|
Addendum to Archaeological Survey for the Proposed Replacement of the SR 11 Bridge over Marbury Creek, Barrow County, Georgia
|
The proposed project would replace the structurally deficient bridge with a new bridge on existing alignment. The new bridge would be approximately 44 ft wide and 180 ft long, and accommodate two 12-ft travel lanes and two 10-ft paved shoulders.
|
Barrow
|
2005
|
3027
|
Pietak, Lynn Marie
|
Phase I Archaeological Survey of Panola Road at I-20 Improvements Project Area, DeKalb County, Georgia
|
The project is an interchange improvement project at Panola Road and Interstate 20. The improvements extend along 1-20 approximately 0.47 miles west of the interchange to 0.09 miles east of the interchange beginning at mile log 70.8 and ending at mile log 71.36.
|
DeKalb
|
2005
|
3030
|
Pietak, Lynn Marie
|
Addendum to Phase I Archaeology Survey of SR 81 at Racetrack Road, Henry County, Georgia
|
Original: The proposed project is located at the intersection of SR 81 and CR 376/Racetrack Road. The proposed project length is approximately 0.3 mile.
|
Henry
|
2005
|
3038
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Intensive Archaeological Survey of the Proposed Big Horse Creek Bridge Replacement, Telfair County, Georgia
|
In February 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted additional survey at the site of the proposed bridge replacement over Big Horse Creek, Telfair County, Georgia. The total length of the redesigned project is 0.50 miles.
|
Telfair
|
2005
|
3039
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey of CR 781/Staten Road over the Withlacoochee River, Lowndes County, Georgia
|
In January and February 2005, Edwards-Pitman Environmental, Inc. (EPEI) conducted additional survey at the site of the proposed bridge replacement over the Withlacoochee River, Lowndes County, Georgia.
|
Lowndes
|
2004
|
3042
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Phase I Archaeological Survey of the Proposed East Hiram Parkway Project area, Paulding County, Georgia
|
During November 2004, Edwards-Pitman Environmental, Inc. (EPEI) conducted a Phase I archaeological survey of the proposed location for the East Hiram Parkway project. The total length of the project is approximately 2.7 miles.
|
Paulding
|
2005
|
3053
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey of SR 268 over Hall's Creek, Coffee County, Georgia
|
A short form for negative findings for an addition to Phase I Archeological Survey of SR 268 over Hall's Creek, Coffee County, Georgia. The project is located on the Broxton South Quadrangle.
|
Coffee
|
2005
|
3054
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to the Phase I Archaeological Survey of SR 144 over Watermelon Creek, Tattnall
|
Original project description: The proposed project would replace the existing bridge over Watermelon Creek with a two-lane bridge on new alignment. The proposed alignment would be located north of the existing bridge with a centerline-to-centerline offset of approximately 60 feet.
|
Tattnall
|
2005
|
3058
|
Silliman, Garrett W., Pietak, Lynn Marie
|
Addendum to Phase I Archaeological Survey of SR 90 over Little House Creek, Ben Hill County, Georgia
|
The project is located approximately seven miles north of Fitzgerald, Georgia. The project would begin approximately 900 feet southeast of Little House Creek, and end approximately 1,150 feet northwest of Little House Creek. The project would be approximately 2,050 feet long (0.39 mile).
|
Ben Hill
|
2005
|