6830 Avery, Paul G. Draft Report of Phase I Archaeological Survey Proposed Composting Structure Hixson Farm Dade County

This project involves the construction of a 40 ft by 72 ft frame structure for the composting of chicken waste and carcasses. The area of potential effect (APE) was considered to be the actual footprint of the proposed building and the area immediately adjacent to it.

Elbert 1977
9450 Avery, Paul G., Garrow, Patrick H. Phase II National Register Assessment of Site 9HT10 at the Proposed Georgia-Robins Aerospace Maintenance Partnership (G-Ramp) Facility, Warner Robins, Georgia

Cultural Resource Analysts, Inc. (CRA), was contracted by MACTEC Engineering and Consulting, Inc., to conduct archaeological testing at Site 9HT10 in Warner Robins, Georgia.

Houston 2011
9580 Avery, Paul G., Ross, Jason Phase I Archaeological Survey for the Proposed Epic RV Resort, Camden County, Georgia

Cultural Resource Analysts, Inc., was contracted by EPIC RV Resort, LLC, to conduct a phase I archaeological survey for the proposed EPIC RV Resort in Camden County, Georgia.

Camden 2017
9758 Avery, Paul G., Ross, Jason, Reynolds, Matt Phase I Archaeological Survey of the Proposed Spaceport Camden, Camden County, Georgia

A Phase 1 archaeological survey of the proposed location of Spaceport Camden in Camden County, Georgia, was completed by archaeologists from Cultural Resource Analysts, Inc., in August and October, 2016.

Camden 2017