Back to top

Entorf, Robert F.

Report Number Author(s) Title Abstract Summary County Year
6316 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of NH-178-1(37), Cobb County

Originally, the proposed project consisted of the addition of left and right turn lanes on the eastbound and westbound approaches of Oglesby and Hill Roads to SR 6/US 278 in Cobb County. The existing traffic signal at Brownsville Road was to be upgraded.

Morgan County, GA 1977
6317 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of NH-178-1(37), Cobb County

The proposed project consists of the addition of left and right turn lanes on the eastbound and westbound approaches of Oglesby and Hill Roads to SR 6/US 278 in Cobb County. The existing traffic signal at Brownsville Road would also be upgraded.

Morgan County, GA 1977
6327 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-186-1(32)01, Cobb County

The proposed project would consist of the r s rfacing._9f SR 92. The project would begin at the intersection of SR 3, and it will end at Lake Shore Drive in the city of Acworth. All construction will be limited to the existing pavement.

Wilcox County, GA 2000
6385 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of STP-46-1(31), Newton County

Project STP-46-1(31) consists of maintenance for drainage problems at two sites in the city of Covington. Site 1 is located at the intersection of SR 12 and Hazelbrand Road. Existing right-of-way at the intersection is approximately 24.4 m (80 ft).

Rabun County, GA 2011
6390 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project SAMA-36(41), Newton County

Project SAMA-36(41) involves the leveling, resurfacing, and addition of 0.6 m (2 ft) paved shoulders on to SR 36 in Newton County. The proposed project would begin at the Butts County line and would end approximately 0.05 km (0.03 mi) north of the intersection of SR 36 and Hummingbird Lane.

Appling County, GA 2011
6393 Entorf, Robert F. Archaeological Assessment of Project IR-20-2(125), Newton County

The proposed project would reconstruct the intersection of 1-20, S.R. 12, C.R. 516, and Turner Lake Road in Covington. The proposed project would begin approximately 1,100 feet east of the intersection of C.R.

Forsyth County, GA 1974
6407 Entorf, Robert F. Archaeological Assessment of STP-013-1(60), Gwinnett County

The proposed project consists of the widening of a portion of SR 13/Buford Highway. The project would begin at the intersection of Old Peachtree Road and continue to end approximately .7 km (.43 mi) northeast of the intersection of Sugarloaf Parkway.

Evans County, GA 1973
6408 Entorf, Robert F. Archaeological Assessment of Projects FR-190-1(8), (9), and (10), Gwinnett and Hall Counties

The combined projects would widen Peachtree Industrial Boulevard in Gwinnett and Hall Counties.

Cobb County, GA 1976
6413 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of BRZLB-135(24), Gwinnett County

The proposed project consists of the replacement of the bridge on CR 235/Alcovy over the Alcovy River northeast of the city of Lawrenceville. The project would begin approximately 110 m (360.9 ft) west of the Alcovy River and would end approximately 100 m (328.1 ft) east of the Alcovy River.

Cobb County, GA 1988
6415 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-190-1(17), Gwinnett/Hall Counties

The proposed project would consist of the reconstruction and resurfacing of SE--147 in Hall and Gwinnett Counties. The proposed project would begin at the bridge over 1-985 (MP 4.16) and would end at the intersection of SR 211 (MP 1.10).

Cook County, GA 1996
Displaying 231 - 240 of 664