Back to top

Fleming, Sherry

Report Number Author(s) Title Abstract Summary County Year
4696 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of BRZLB-13(13), Barrow County

The proposed project consists of the replacement of the bridge on CR 125/McElhannon Road over the Apalachee River just south of the city of Bethlehem.

Barrow County, GA 1998
4707 Duff, Eric Anthony, Fleming, Sherry Archaeological Assessment of Project BLDG-DIST-6-95(040), Bartow County

The proposed project would consist of the construction of a traffic Signal Headquarters for GDOT District 6 in Bartow County. The project also includes the construction of a driveway for the facility and a chain link fence around the facility.

Bartow County, GA 1995
4716 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of BLDG-DST6-95(41), Bartow County

The proposed project consists of the construction of a new metal District Six Sign Shoo building. The building would be located adjacent to Old Martin Road/CR 130 across the street from an existing maintenance compound northwest of the city of Cartersville.

Bartow County, GA 1997
4718 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of BHF-012-1(95), Bartow County

The proposed project consists of the replacement of the existing structurally deficient east and_ westbound bridges on SR 20/US 411 over the W & A Railroad and SR 293. Additionally, the project will include the widening of the bridges by 4.66 m (15.3 ft).

Bartow County, GA 1996
4738 Fleming, Sherry Archaeological Assessment of STP-1220(6), Berrien/Lanier/Clinch Counties

The proposed project consists of the paving of 0.6 m (2 ft) of the existing shoulders along SR 168. The project would begin at the intersection of SR 135 in Berrien County and would end at the intersection of SR 37 in Clinch County.

Berrien County, GA 1998
4739 Fleming, Sherry Archaeological Assessment of BRSLB-2632(8), Ben Hill County

The proposed project would consist of the replacement of the bridge on CR 245 over Willacoochee Creek approximately 1.67 km (1.04 mi) east of the junction of SR 107 in Ben Hill County.

Ben Hill County, GA 1998
4744 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of STP-1177(1), Ben Hill/ Wilcox County

The proposed project consists of the paving of 0.6 m (2 ft) of the existing shoulders along SR 233. The project would begin at the intersection of SR 90 in Ben Hill County and would end at the intersection of SR 112 in Wilcox County.

Ben Hill County, GA 1996
4748 Fleming, Sherry Archaeological Assessment of Project STP-2718(5), Ben Hill County

The proposed project would consist of the paving of 0.9 m (3 ft) of the existing shoulders of SR 206 in Ben Hill County. The proposed project would begin at t e intersection of US 319/SR 107 (MP 0.00) and would end at the intersection of CR 40 (MP 8.9).

Ben Hill County, GA 1998
4749 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-2718(4), Ben Hill/ Irwin / Coffee Counties

The proposed project would consist of the paving of 1.2 m (4 ft) of the existing shoulders of SR 206 in Ben Hill County. Also included in the proposed project would be the leveling and resurfacing of the entire pavement width.

Ben Hill County, GA 1998
4750 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-2943(4)01, Ben Hill County

The proposed project would consist of the paving of approximately 0.6 m (2 ft left and right) of the existing shoulders on US 319/SR 107. The project would begin at the intersection of SR 206 northeast of Fitzgerald and end at the Ben Hill-Coffee County line.

Ben Hill County, GA 1995
Displaying 21 - 30 of 413