4754
|
Entorf, Robert F., Fleming, Sherry
|
Archaeological Assessment of Project STP-34-2(31), Irwin-Ben Hill Counties
|
The proposed project would consist of the paving of approximately 0.6 m (2 ft left and right) of the existing shoulders on US 129/SR 11. The project would begin at the curb and gutter section in Ocilla and will end at the intersection of SR 107 in Ben Hill County.
|
Ben Hill
|
1995
|
4781
|
Fleming, Sherry
|
Archaeological Assessment of Project PR-184(025), Brantley County
|
Project PR-184(025) involves the grading, drainage, base, and surfacing of CR 184 (Florida Loop Road) in Brantley County. The project would begin at the intersection of SR 520 and would end at the intersection of Sn 23 in the city of Nahunta. Existing right-of-way is approximately 6.1 m (20 ft).
|
Brantley
|
1998
|
4822
|
Duff, Eric Anthony, Fleming, Sherry
|
Archaeological Assessment of Project STP-014-1(65), Screven/ Burke Counties
|
The proposed project would consist of plant mix resurfacing of State Route 24 beginning at MP 31.34 in Screven County and ending at MP 3.46 in Burke County. All disturbance will be confined to the area of the existing pavement.
|
Burke
|
1995
|
4838
|
Entorf, Robert F., Fleming, Sherry
|
Archaeological Assessment of Project STP-005-5(41), Bulloch County
|
The proposed project would consist of the paving of approximately 0.6 m (2 ft left and right) of the existing shoulders on SR 26/US 80 in Bulloch County. The project would begin at the intersection of the SR 119 Connector and end at the Bryan County line.
|
Bulloch
|
1997
|
4839
|
Duff, Eric Anthony, Fleming, Sherry
|
Archaeological Assessment of Project EDS-555(6), Bulloch County
|
The proposed project would widen the West Statesboro Bypass from a 2-lane to a 4-lane highway. The project would begin at the intersection of US 301 and continue south to end at the intersection of US 80. Existing right-of-way is approximately 61 m (200 ft).
|
Bulloch
|
1996
|
4850
|
Entorf, Robert F., Fleming, Sherry
|
Archaeological Assessment of Project STP-0577(20), Bulloch County
|
The proposed project would consist of the paving of 0.6 m (2 ft) shoulders of SR 46 in Bulloch County. The proposed project would begin at the intersection of SR 73/US 301 (MP 4.33) and would end at the intersection of SR 67 (MP 14.80) in Bulloch County.
|
Bulloch
|
1998
|
4862
|
Entorf, Robert F., Fleming, Sherry
|
Archaeological Assessment of STP-022-2(13), Butts/Jasper Counties
|
The proposed project consists of the replacement of the bridge on SR 16 over the Ocmulgee River at the Butts/Jasper county line. The project would begin at approximately MP 17 and would end at approximately 243.8 m (800 ft) east of the bridge.
|
Butts
|
1998
|
4863
|
Entorf, Robert F., Fleming, Sherry
|
Archaeological Assessment of STP-00MS(334), Butts County
|
The proposed project consists of the leveling and resurfacing of SR 16 in Butts County. The project would begin at the bridge over I-75 (MP 1.40) and would end at the Jasper County line.
|
Butts
|
1998
|
4872
|
Fleming, Sherry
|
Archaeological Assessment of STP-0518(4), Mitchell County
|
No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.
|
Mitchell
|
1998
|
4876
|
Fleming, Sherry, Bowen, William R.
|
Archaeological Assessment of STP-1503(2), Marion County
|
No existing or eligible National Register archaeological resources were located within the project's area of potential environmental effect.
|
Marion
|
1998
|