Back to top

Fleming, Sherry

Report Number Author(s) Title Abstract Summary County Year
4654 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-00MS(186), Bartow, Chattooga, Floyd, Gilmer, Gordon, Murray, Pickens, Walker, and Whitfield Counties

The proposed project would involve the encasing of the existing steel H-beams in concrete to strengthen the bridge supports at locations throughout the northwestern portion of the state. Existing right-of-way varies from bridge to bridge.

Bartow 1996
4667 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-0686(25), Wilkinson/Baldwin Counties

The proposed project would consist of the paving of the existing shoulders [4.9 m (1.5 ft)] of SR 112. The project would begin at MP 23.28 and end at MP 3.00 just south of the city of Milledgeville in Baldwin County. All construction will be limited to the existing shoulders.

Baldwin 1996
4675 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of STP-042-2(35), Baldwin County

The proposed project consists of the removal of the Central of Georgia Railroad bridge over SR 29/US 441 south of Milledgeville and drainage improvements at two other locations in the city of Milledgeville. The existing right-of-way is approximately 18.3 m (60 ft).

Baldwin 1996
4676 Entorf, Robert F., Fleming, Sherry Archaeological Assessement of BRSLB-2109(1), Baldwin County

The proposed project consists of the replacement of the bridge on CR 470 (Pancras Road) over Camp Creek. The proposed project would begin approximately 89.3 m (293 ft) west of Camp Creek and would end approximately 103.9 m (341 ft) east of Camp Creek.

Baldwin 1997
4677 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-0781(11), Wilkinson/ Baldwin Counties

The proposed project would consist of the paving of approximately 0.6 m (2 ft left and right) of the existing shoulders on SR 243.

Baldwin 1996
4683 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-00MS(142), Multiple Counties

The proposed project would involve the encasing of the existing steel H-beams in concrete to strengthen the bridge supports at locations throughout the state. Existing right-of-way is approximately 30.5 m (100 ft). All construction will be limited to the existing right-of-way.

Bartow 1997
4691 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-00MS(295), Barrow County

The proposed project would consist of the leveling and resurfacing of SR 211 in Barrow County. Also included in the proposed project would be the paving of 0.6 m (2 ft) of the existing shoulders of SR 211.

Barrow 1998
4692 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-1308 (9), Barrow/Walton County

The proposed project would consist of the paving of approximately 0.6 m (2 ft left and right) of the existing shoulders on SR 81 in Bulloch County. The project would begin at the intersection of SR 20 in Walton County and end at Stafford Street in the city of Winder in Barrow County.

Barrow 1996
4693 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of Project STP-0910 (15), Barrow County

The proposed project would consist of the paving of 0.6 m (2 ft) of the existing shoulders of SR 124. The proposed project would begin at the Gwinnett/Barrow County line and would end at the SR 53 intersection in Jackson County.

Barrow 1998
4695 Entorf, Robert F., Fleming, Sherry Archaeological Assessment of STP-065_3(52), Barrow County

The proposed project consists of improvements to the intersection of SR 53 and Rockwell Church Road/CR 4 just north of the city of Winder.

Barrow 1998
Displaying 11 - 20 of 413