Report Number Author(s) Title Abstract Summary County Year
8072 Williams, Siska SR 6 at CS 6396/North Commerce Drive

The proposed operational improvement project would consist of improvements at the intersection of SR 6/Camp Creek Parkway and North Commerce Drive. This project proposes to utilize an existing median to construct a left turn lane (triple left turn configuration) from N. Commerce Dr.

Jones 2014
8080 Williams, Siska Reevaluation of Railroad Crossing Consolidation Project, CSXT

The proposed project includes the closure of highway-rail at-grade crossings at W. Green Street (CS 81213) and S Lee Street (CS 72813L where "T'' Type turnarounds will be constructed at both locations on the south side of the CSX Transportation railroad ROW.

Catoosa 2012
8090 Williams, Siska SR 404 (I-16) at Black Creek-Scour Repairs

The project proposed the rehabilitation of scouring and countermeasures against future bridge scour. The project also intends to correct spalls and cracks in the bridge deck and substructure and to overlay copolymer on the bridge deck.

Newton 2014
8099 Williams, Siska State Route (SR) 400 at Interstate 285 (I-285) Interchange Reconstruction

The proposed project would include operational improvements along I-285 and SR 400 in the vicinity of the I-285/SR 400 interchange.

Glynn 2011
8112 Williams, Siska Bridge Foundation Investigation for the SR 347 Bridge over Norfolk Southern #717815K

The proposed safety project would consist of a bridge foundation inspection of GDOT Bridge ID#139-5085-0 located at SR 347/Friendship Road over Norfolk Southern #717815K. The process would consist of drilling 4-inch holes through the bridge deck and into the ground.

Brantley 2013
8114 Williams, Siska Sr 404 Spur at CR 744/Hutchinson Island Road Ramp Interchange

The proposed project will repair a section of failed roadway and washed out grass shoulder.

Cherokee 2013
8159 Williams, Siska I-85 Northbound from SR 140 to CR 560/Indian Trail Lilburn Road

The proposed operational improvement project would consist of constructing an auxiliary lane on 1-85 northbound between the SR 140/Jimmy Carter Blvd and Indian Trail lilburn Road interchanges. Additional ROW is not required.

Putnam 2012
8529 Williams, Siska District 4 Maintenance Projects

Maintenance Projects in Colquitt and Decatur Counties (milling, inlaying existing curb and gutter sections, and adding curb cut ramps to existing sidewalk connections).

Coweta 2015
8530 Williams, Siska District 1Maintenance Projects along SR 53 WB & SR 369 at the Chattahoochee River

Maintenance Project in Forsyth and Hall Counties (remove the existing copolymer overlay and replace it with another polymer overlay system).

Coweta 2015
8664 Williams, Siska Safe Routs to Schools Project

Cate Road (Golden Isles Elementary) consists of two 10’ travel lanes. The north side of the roadway has a grasses shoulder and the south side of the roadway has a 4.5’ sidewalk separated from the edge of pavement with a 4.5’ grasses buffer. Existing right of way is approximately 70 feet.

Tift 2011
Displaying 41 - 50 of 114