Back to top

Williams, Siska

Report Number Author(s) Title Abstract Summary County Year
8835 Williams, Siska Statham Elementary School SRTS Pedestrian Enhancements

This project proposes to place crosswalks, signage, sidewalks, curb and gutter, and a retaining wall in the vicinity of Statham Elementary School along Providence Road in Statham, Barrow County, Georgia.

Cherokee 2006
8842 Williams, Siska Reevaluation of the widening of Talbotton Road/Warm Springs Road

Talbotton/Warm Springs Road Road will be widened for 1.9 miles between 7th Ave. and Woodruff Road/Hilton Ave in Columbus, Georgia.

Colquitt 1998
8845 Williams, Siska SR 410 from CR 5172/Montreal Road to SR 10

The proposed work consists of milling, resurfacing, leveling, patching, striping, and raised pavement markers. There are eight (8) curb cut (wheelchair) ramps to be constructed.

Coweta 1998
8846 Williams, Siska A Safe Routes to School (SRTS) project consisting of safety Improvements along East Park Avenue in the vicinity of W.G. Nunn Elem. School and J.L. Newbern Middle School

This project is a Safe Routes to School (SRTS) infrastructure project that will improve pedestrian and bicycle accessibility for students within a 1 mile radius of W.G. Nunn Elementary School and J.. L. Newbern Middle School in Valdosta Ga,.

Fayette 1998
8849 Williams, Siska SR 85 from Fayette County Line to SR 331

The project begins at the bridge joint on the bridge over Camp Creek at Fayette County line (MP 0.00). The project ends north side of SR 331/Forest Parkway. The project length is approximately 12.8 miles. Note project log details northbound and southbound separately.

Fayette 2013
8851 Williams, Siska Stanton Road Surplus Property

The Department is intending to exchange property with Baxter Pharmaceuticals to facilitate a future development in this area. Track 1: The property is located to the east of the 1-20 and US 278/SR 12 interchange (located to the east of Stanton Road).

Wilkinson 2013
8869 Williams, Siska Reevaluation of Grade Separation ofSR 316/US29@ SR 11

Original Description: The project would grade separate the existing at-grade intersection of State Route (SR) 316 with SR 11 in Barrow County, Georgia. The proposed grade separation would include full interchange access from SR 316 in both directions to SR 11 in both directions and vice-versa.

Pulaski 1996
8870 Williams, Siska 1-75 at CR 824/Jodeco Road-Interchange Improvement

The reconstruction of Jodeco Road (CR 824) begins on Jodeco Road approximately 846 feet west of the intersection of Plantation Boulevard.

Laurens 2000
8872 Williams, Siska CR 228/Garrison Road at NS #729365A in Chauncey

The proposed project consists of the installation of warning device equipment on railroad right-of-way, the installation and/or removal of signing for the devices, and the installation of pavement marking for the devices along the roadway.

Pulaski 1992
8894 Williams, Siska Property Surplus Request Troup County, Georgia

Tract A and Tract B (a total of 4.65 acres) are located within the NW interchange quadrant of I-85 and SR 109/LaFayette Parkway. The quadrant is mostly wooded with some clearing along the interstate, interstate off ramp, and SR 109.

Gordon 1992
Displaying 61 - 70 of 114