11424 Paglione, Teresa L. Archaeological Assessment of Project BRS-0729(5), Tattnal County

Replace existing bridge and approaches with a triple 8' by 6' concrete bridge culvert. No additional R/W required.

Tattnall County, GA 1986
11428 Paglione, Teresa L. Archaeological Assessment of Project BRSLB-1832(2), Bleckley County

Begins approximately 200 ft west of creek and ends approximately 200 feet east of creek. Bridge structure will be a triple 7’ x 7’ bridge culvert on road will be closed during construction.

Bleckley County, GA 1990
11429 Lyon, Elizabeth A., Paglione, Teresa L. Archaeological Assessment of Revised Project FR-008-1(31), Glynn County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, Project FR-008-1(31), Glynn County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NRHP)

Glynn County, GA 1991
11430 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-293(8), Upson County

200’ x 40’ bridge; road will be closed during construction. No significant archaeological materials, no wetland involvement.

Upson County, GA 1991
11432 Paglione, Teresa L. Archaeological Assessment of Project BF-029-1(28), Macon County

25.2'X 60' bridge with timber pilings and a concrete deck. Approaches have 24' paving with 7' shoulders. Existing right-of-way is approximately 100'. Replace bridge on existing alignment with a triple 9'x 9' concrete bridge culvert. Reconstruct approaches to provide 24' paving and 10' shoulders.

Macon County, GA 1993
11436 Paglione, Teresa L. Archaeological Assessment of Project BRF-027-3(15), Stewart Counties

Bridge would be 140’ x 44;’ Project begins 800 feet south and ends 1000 feet north of SCL R/R. Existing bridge will be the detour during construction.

Stewart County, GA 1990
11446 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-217(16), Newton County

Project begins 400 ft. west of creek and ends 400 ft. east of creek. New structure is a 4 barrel 10 ft. x 10 ft. x 75 ft. concrete bridge culvert. Required right of way is 80 ft. Co. Rd. 90 will be closed during construction, no on-site detour is proposed.

Newton County, GA 1990
11449 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-257(8), Stephens County

The existing structure is 37 feet long and 23.4 wide consisting of concrete abutments, steel beams, and a concrete deck. The required structure will consist of 50 feet of triple 9 x 8 box culvert.

Stephens County, GA 1990
11450 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-015(13), Bartow County

Existing structure a 30’ x 16’ timber bridge. Existing right of way 40 feet. Begins approximately 600’ south of Two Run Creek. Ends approximately 1000’ north of Two Run Creek. New Structure a four barrel 10’ x 6’ bridge culvert. Road will be closed during construction.

Bartow County, GA 1990
11456 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-255(2), Spalding County

140’ x 28’ bride; no wetland involvement, no significant archaeological materials.

Spalding County, GA 1986