11226 Paglione, Teresa L. Archaeological Assessment of BHM-9106(1), Clayton County

Existing bridge is 22.5’ X 50’ with a concrete substructure, 3 span steel beams and a concrete deck, existing right of way 80 ft. New structure will be 44’ X 50’ single span with approaches beginning 700’ west of the bridge and ending 800 ft east of the bridge.

Clayton County, GA 1985
11228 Paglione, Teresa L. Archaeological Assessment of BRS-2418(4), Clinch County

567’ X 22’ steel and concrete over cypress creel and 243’ X 22’ steel and concrete over the Overflow. Existing right of way is 300’ at Cypress Creek and 200’ at the Overflow. A proposed 567’ X 40’ concrete bridge over Cypress creek existing alignment.

Clinch County, GA 1986
11229 Paglione, Teresa L. Archaeological Assessment of Project BRS-1220(3), Berrien County

150’ X 24’ bridge structure with timber pilings, concrete caps, pre cast concrete deck and steel handrail. 100’ of existing right of way. Bridge of Ten mile creek is proposed to be replaced on existing alignment with a 150’X 40’ concrete bridge.

Berrien County, GA 1988
11241 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-199(10), Meriwether County

23.9'X 97' bridge with timber pilings and a concrete deck. Approaches are 677' in length and have 21' paving with 5'shoulders. Existing right-of-way is 80'. Replace bridge on existing alignment with a 30'X 130' concrete bridge .

Meriwether County, GA 1988
11242 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-207(14), Monroe County

43'X12.3 ' bridge with concrete substructure, steel main support, and timber derl 35' right-of- way. Begins approx. 0.25 mile west of creek and ends approx. 0 . 25 mile east of creek . Replace on existing location with triple 9'X8' bridge culvert. 100' right- of- way required.

Monroe County, GA 1993
11243 Paglione, Teresa L. Archaeological Assessment of Project BRZLB-015(8), Bartow County

Bridge over Connesena Creek using county Road 78/Old Rome Road. Existing structure is a 15.7’ wide x 60’ long concrete decked over steel stringer beam bridge with no handrails or guardrails. Existing right of way 40’. Proposed project begins approx. 300’ west of Connesena Creek and ends approx..

Bartow County, GA 1986
11268 Paglione, Teresa L. Bridge Review Sheet: Project No. BHSLB-2053(1), Macon County

Bridge Review project. Its project number is BHSLB-2053(1), Macon County. It’s located on road CR 288/Whitewater Road and is over Meadow Creek. The existing structure is 37 feet by 17.2 feet and is a concrete bridge. The existing ROW is 80 feet.

Macon County, GA 1986
11274 Paglione, Teresa L. Archaeological Assessment of Project 50921-33-0-1, Dougherty County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, project 50921-33-0-1, Dougherty County has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NR

Dougherty County, GA 1986
11285 Paglione, Teresa L. Archaeological Assessment of Project BHF-089-1(19), Baldwin County

Bridge on SR 49 over fishing creek. No wetland involvement, no historic materials, not archaeological sites.

Baldwin County, GA 1985
11296 Paglione, Teresa L. Bridge Categorical Exclusion, BRF-027-3(13) Stewart County

Bridge categorical exclusion, BRF-027-3(13), Stewart County. The bridge is over US 27/ SR 1 and over Pataula Creek. The existing bridge is 300 feet long by 23.8 feet wide with an existing ROW at 200 feet. The proposed project will lengthen the bridge to 340 feet long by 40 feet wide.

Stewart County, GA 1990