Back to top

Paglione, Teresa L.

Report Number Author(s) Title Abstract Summary County Year
8318 Paglione, Teresa L. Archaeological Assessment of Project STP-001-1(26), Gordon County

The proposed project would widen US 41/SR 3/North Wall Street in Calhoun. The proposed project begins at the intersection of US 41/SR 3/North Wall Street and SR 156/Red Bud Road and ends at the intersection of CR 492/Moss Parkway and US 41/SR 3/where it ties into an existing five lane section.

Columbia County, GA 2005
8336 Paglione, Teresa L. Archaeological Assessment of Project EDS-27(93), Polk-Floyd Counties

The project is the proposed reconstruction and widening of an 8.5 mile section of US 27/SR 1 from the north terminus of the proposed Cedartown Bypass to Booze Road just south of Rome.

Fulton County, GA 2012
8392 Paglione, Teresa L. Archaeological Survey of Project TSAP-894(1), Peach County

The proposed project corridor for the Fort Valley State College Access Road, GDOT/GEPA Project TSAP-894(1), Peach County, consists of an access road on new location for Fort Valley State College between SR 49 and US 341/SR 7.

Dawson County, GA 2014
8415 Paglione, Teresa L. Archaeological Assessment of Project MR-5614(1) Gordon County

The project proposes to improve the intersections of SR 156 with SR 136 Connector and SR 156 with CR 492 on existing location. The existing right-of-way is 80 feet; a maximum of 70 feet of additional right-of-way would be required.

Effingham County, GA 2013
8459 Paglione, Teresa L. Archaeological Assessment of Project MR-8042(5), Muscogee County

The proposed project consists of the widening and reconstruction of Buena Vista Road in Columbus. The project begins at the intersection of Buena Vista Road and Wynnton Road and ends at the intersection of Buena Vista Road and Illges Road.

Murray County, GA 1995
8460 Paglione, Teresa L. Archaeological Assessment of Project MR-8038(7); Muscogee County

The proposed project consists of the widening and reconstruction of St. Mary's Road (City Street 2108) in Columbus. The project begins at the intersection with Buena Vista Road and ends at the intersection of Robin Road.

Union County, GA 1995
8465 Paglione, Teresa L. Archaeological Assessment of Projects FR-178-1(33) and (34), Polk County

Project FR-178-1(33) begins just west of the Cedartown Bypass at the intersection of us 278/SR 6 and Woodall Road and extends easterly for approximately 4.6 miles, ending at the intersection of us 278/SR 6 and Old Cedartown Road.

Clayton County, GA 2014
8477 Paglione, Teresa L. Archaeological Survey of Project STP-191-1(11), Gilmer County

Project STP-191-1(11) consists of a proposal to provide two eastbound passing lanes on US 76/SR 282 at two locations west of Ellijay. The westernmost section would begin near Crooked Branch Creek and extend approximately 1.7 miles to the east, ending at the intersection with CR 53.

Cobb County, GA 2015
8479 Paglione, Teresa L. Archaeological Assessment of Project RS-1360(8), Gilmer County

The proposed project would widen SR 282 in Ellijay from the Coosawattee River to CR 193 between the Cartecay River and SR 5. A portion of the widening will be shifted away from the Cartecay River due to its close proximity the the existing road.

DeKalb County, GA 2015
8480 Paglione, Teresa L. Archaeological Assessment of Project STP-856(14), Gilmer County

The proposed project would widen SR 52 in Ellijay from the intersection at SR 2 to the bridge over the Cartecay River. The project begins approximately 450 feet southwest of SR 2 and ends 450 feet northeast of SR 2.

Fulton County, GA 2015
Displaying 91 - 100 of 269