Back to top

Paglione, Teresa L.

Report Number Author(s) Title Abstract Summary County Year
6540 Paglione, Teresa L. Archaeological Assessment of Projects MR-9108(5) and BHMLB-9108(3), Clayton County

Project MR-9108(5) consists of the widening and reconstruction of Battlecreek Road from Valley Hill Road east to Southlake Parkway in Morrow. Project BHMLB-9108(3) would be the replacement of the bridge over Jesters Creek.

Clayton 1973
6541 Paglione, Teresa L. Archaeological Assessment of ProjectMR-9109(1), Clayton County

Project MR-9109(1) consists of the widening of Mt. Zion Road in Morrow from Jonesboro Road/S.R. 54 to the intersection with Mt. Zion Boulevard. The existing right-of-way is 80 feet; the required right-of-way would be 90 feet.

Fulton 1973
6542 Paglione, Teresa L. Archaeological Assessment of Project MR-9107(2), Clayton County

Project MR-9107(2) consists of the widening of Flint River Road. The project begins at Webb Road and continues east toward Tara Boulevard/U.S. 19/U.S. 41. Intersection improvements at Webb Road, Kendrick Lane, and Roberts Road will be on new location.

Clayton 1973
6545 Paglione, Teresa L. Archaeological Assessment of Project FR-001-4(48). Clayton County

This project consists of the construction of frontage roads along Tara Boulevard/US 41/US 19 from 1-75 to SR 54. A maximum of 100 feet of additional right-of-way would be required for the entire length of the 4.5 mile project corridor.

Clayton 1976
6565 Paglione, Teresa L. Archaeological Assessment of Projects FR-164-1(29) and BRF-164-1(18), Clayton-Fayette Counties

Project FR-164-1(29) is the proposed widening and reconstruction of SR 54 from McDonough Road in Fayette County to US 19/41/SR 3 in Clayton County, including the replacement of existing bridges. Project BRF-164-1(18) consists of the construction of three parallel bridges.

Columbia 1986
6566 Paglione, Teresa L. Archaeological Assessment of Project SR-2343(10), Gwinnett County

The proposed project would consist of the leveling and resurfacing of a portion of SR 24 in Jenkins County. Also included in the proposed project would be the paving of 0.61 m (2 ft) shoulders along the entire roadway.

Chattahoochee 1989
6881 Paglione, Teresa L. Archaeological Assessment of FR-161-1(10), Monroe County

The following is being furnished to you for inclusion, as written, in the appropriate environmental document:

Hart 1985
6949 Paglione, Teresa L. Archaeological Assessment of Projects FR-005-3 (20) and BHF-005-3 (21)

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, GDOT Projects FR-005-3(20) and BHF-005-3(21), Laurens County, have been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Regist

Clay 1961
6950 Paglione, Teresa L. Archaeological Assessment of Project IR-16-1 (106) Laurens County

In compliance with Section 106 of the National Historic Preservation Act of 1966 and amendments thereto, Project IR-16-1(106), Laurens County, has been surveyed with respect to archaeological resources, especially those on or eligible for inclusion in the National Register of Historic Places (NR

Fayette 1994
7224 Paglione, Teresa L. Archaeological Re-Evaluation of Project FLF-540(10), Taylor County

The project proposes to construct the Butler Bypass on new location south of Butler.

Irwin 1998
Displaying 71 - 80 of 269