Back to top

Paglione, Teresa L.

Report Number Author(s) Title Abstract Summary County Year
6131 Paglione, Teresa L. Archaeological Survey of Project STP-191-1 (9), Murray County

The project proposes to relocate a section of SR 282/US 76 southeast of Chatsworth. The project would begin at SR 61/US 411 and extend easterly on new location for approximately 0.65 mile. The project would end an estimated 1200 feet northeast of the intersection of S 2860/CR 309.

Columbia 1995
6260 Paglione, Teresa L. Archaeological Assessment of Revised Project FR-088-1(31), Glynn County

The proposed project consists of the widening and reconstruction of US 341/SR 27. This 0.87 mile project begins at Crispen Boulevard and ends approximately 500 feet beyond Glynndale Drive in Brunswick. The existing right-of-way is 100 feet; the required right-of-way would be 120 feet.

Glynn 1978
6262 Paglione, Teresa L. Archaeological Assessment of Projects GIP-341(27) and (28) and BRF-008-1(49) and (50), Glynn county.

Project GIP-341(27) proposes to would widen US 341 from the Wayne/Glynn County line to CR 432. Existing right-of-way varies from 100 to 200 feet; an additional 34 to 84 feet of right-of-way would be required. Total project length is approximately 2.98 miles.

Glynn 1985
6318 Paglione, Teresa L. Archaeological Assessment of Projects IR-75-3(165) & MR-9000(21), Cobb County

The projects propose to add additional turning lanes on Delk Road across 1-75, widen the bridge across 1-75 on Delk Road, and to construct a northbound offramp at 1-75 and Delk Road. Two additional lanes are to be constructed on Delk Road between 1-75 and U.S. 41.

Greene 1977
6323 Paglione, Teresa L. Archaeological Assessment of Project IR-75-3(165), Cobb County

This project proposes to add additional turning lanes on Delk Road across 1-75, widen the bridge across 1-75 on Delk Road, and to construct a northbound offramp at 1-75 and Delk Road. Two additional lanes are to be constructed on Delk Road between 1-75 and West of Franklin Road.

Gwinnett 1999
6394 Paglione, Teresa L. Archaeological Assessment of Borrow Pit/Wetland Mitigation Site for Project IR-20-2(125), Newton County

The proposed project would provide a borrow pit/wetland mitigation site for the construction of the proposed eastbound ramp improvements of the 1-20 and SR 278 interchange. The proposed borrow pit/wetland mitigation site would be located south of Cook Road/C.R. 512 northwest of Oxford.

Gwinnett 1974
6424 Paglione, Teresa L. Archaeological Assessment of Project IR-85-2(126), Gwinnett County

The proposed project consists of the reconstruction of the interchange and the replacement of the bridge at 1-85 and SR 317. All four ramps would be moved further from the SR 317 bridge over 1-85; the limits of access along SR 317 would be extended to approximately 150 feet from ramp returns.

Lowndes 1999
6425 Paglione, Teresa L. Archaeological Assessment of Project SR-2343(10), Gwinnett County

The proposed project consists of the widening and addition at an eastbound lane from the Interstate 85 northbound exit ramp to Crestwood Drive at the Pleasant Hill Road Exit. The total project is approximately 0.5 mile in length.

Columbia 1992
6430 Paglione, Teresa L. Archaeological Assessment of Project SR-2489(8) and MR-9285(4)

The projects propose to widen and resurface US 23/SR 13 from 2 lanes to 5 lanes with a 20 ft. raised median from Langford to Old Peachtree Road in Duluth.

Cook 1995
6454 Paglione, Teresa L. Archaeological Re-evaluation of Project FR-054-1(37), Gwinnett County

The proposed project would widen and reconstruct State Route 20 beginning just southeast of Ozora Road and extending northwesterly to Plantation Boulevard. The existing right-of-way is 100 feet; the proposed right-of-way is 175 feet.

Glynn 2000
Displaying 51 - 60 of 269