Back to top

Perrine, Charles A.

Report Number Author(s) Title Abstract Summary County Year
9577 Pietak, Lynn Marie, Perrine, Charles A. Phase I Archaeological Survey for the Proposed SR 99 Widening, Glynn County, Georgia

This project spans a 9.1-mile stretch from the State Route (SR) 32/SR 99 convergence to Interstate (I-)95 in Glynn County; which includes the span from the SR 32/SR 99 convergence with I-95.

Glynn 2017
9652 Perrine, Charles A. Phase I Archaeological Survey for the Bridge Rehabilitation at Six Bridge Locations over Interstate 20, Carroll County, Georgia

The purpose of this project is bridge rehabilitation at six bridge locations over Interstate (I-) 20 in Carroll County, Georgia (Table 1)(Figures 1-6). The proposed project will include raising each bridge between 1 to 5 inches to a minimum vertical clearance of 17 feet.

Carroll 2017
10021 Perrine, Charles A. GDOT Archaeological Assessment In‐House Survey Report GDOT Project: Phase 1 Archaeological Survey of Proposed Resurfacing along State Route 54 in Fayette County, Georgia

The proposed work will take place along a 12.94 mile section of State Route (SR) 54 in Fayette County from the Coweta county line to McDonough Road (Figure 1).

Fayette 2013
10090 Perrine, Charles A. Phase 1 Archaeological Survey of Proposed Resurfacing along State Route 50 in Quitman County, Georgia

The proposed work will take place along a 2.723 mile section of State Route (SR) 50 in Quitman County beginning at the Georgia/Alabama State Line and ending approximately 718 feet east of SR 27/SR 29 (Figure 1).

Quitman 2013
Displaying 1 - 4 of 4