Back to top

Perrine, Wesley A.

Report Number Author(s) Title Abstract Summary County Year
13092 Perrine, Wesley A. Addendum Phase I Archaeological Survey for the Replacement of Bridge 159-5010-0 over Pittman Branch for the Low Impact Bridge Program, Jasper County, Georgia

The purpose of this project is to replace a structurally deficient bridge (Structure ID 159-5010-0) carrying Pitts Chapel Road/County Road (CR) 16 over Pittman Branch in Jasper County, Georgia (Figure 1). The existing Right-of-Way (ROW) measures approximately 60 feet from centerline.

Jasper 2018
13142 Perrine, Wesley A. Phase I Archaeological Survey of the Proposed Culvert Replacement on SR 24, Bulloch County, Georgia

The Georgia Department of Transportation (GDOT) plans to replace a damaged culvert along State Route (SR) 24 in Bulloch County, Georgia.

Bulloch 2018
13143 Perrine, Wesley A. Phase I Archaeological Survey for the Emergency Repair of State Route 54 in Fayette County, Georgia

The proposed project is an emergency repair that will take place along a 300 foot section of State Route (SR) 54 in Fayette County, Georgia (Figure 1). Recently, there has been a pipe failure under the roadway with a sink hole in the median.

Fayette 2018
13144 Perrine, Wesley A. Phase I Archaeological Survey for the Emergency Slope Repair of State Route 60 in Lumpkin County, Georgia

The proposed is an emergency slope repair and work will take place along a 150- foot linear section of State Route (SR) 60 in Lumpkin County, Georgia near Dockery Gap Road (MP 19)(Figure 1). The project is located within the Chattahoochee National Forest.

Fayette 2018
13169 Perrine, Wesley A. Phase I Archaeological Survey of the Proposed Replacement of the Bridge (Structure ID#121-5198-0) on CS 7001/Potomac Drive over Camp Creek, Fulton County, Georgia.

The proposed project would consist replacing the bridge carrying CS 7001/Potomac Drive over Camp Creek in Fulton County, Georgia (Figure 1). The existing facility along Potomac Drive consists of two 14-foot with urban shoulders south of bridge and rural shoulders north of the bridge.

Fulton 2018
13252 Perrine, Wesley A. Addendum Phase I Archaeological Survey for the Replacement of Bridge 195-5043-0 over Masons Mill Creek, Madison County, Georgia.

The purpose of this project is to replace a structurally deficient bridge (Structure ID 195-5042-0) carrying Old Wildcat Bridge Road over Mason Mill Creek in Madison County, Georgia (Figure 1).

Madison 2018
13427 Perrine, Wesley A. Phase I Archaeological Survey for the Addition of Turn Lanes Along Bishop Farms Parkway, Oconee County, Georgia

The proposed project would consist of proposed improvements to the existing signalized intersection of State Route (SR) 53/Experiment Station Road at County Route (CR) 828/Bishop Farms Parkway, near the city of Watkinsville in Oconee County (Figure 1).

Oconee 2018
13716 Perrine, Wesley A. Cultural Resources Survey of the “LAX - A” Self-Support Tower Telecommunication Facility, Ocilla, Irwin County, Georgia

The purpose of this project is to replace Bridge 049-5037-0 carrying County Road (CR) 52, Ralph Davis Road over Long Branch Tributary in Charlton County (Figure 1). The existing Right-of-Way (ROW) measures approximately 80 feet from centerline. The bridge is 70 feet long.

Charlton 2017
14592 Perrine, Wesley A. Phase I Archaeological Survey for the Fall Line Freeway/ State Route 24, Washington County, Georgia – USACE Section 106 Report

The proposed project would consist of the widening of State Route (SR) 24 in Washington County east of Chambers Brooks Spring Road to west of Helton Lane for approximately 1.85 miles.

Washington 2019
14598 Perrine, Wesley A. Second Addendum Phase I Archaeological Survey for the Widening and Reconstruction of State Route 101 in Rome, Georgia.

The proposed project would consist of widening and reconstructing North 2nd Avenue/State Route (SR) 101 in Rome, Georgia.

Floyd 2021
Displaying 41 - 50 of 50