Report Number Author(s) Title Abstract Summary County Year
10977 Perrine, Wesley A. Addendum Phase I Archaeological Survey for the Replacement of Bridge 279-5020-0 over Rocky Creek, Toombs County, Georgia

The purpose of this project is to replace a structurally deficient bridge (Structure ID 279-5020-0) carrying Tippet Creek Road over Rocky Creek in Toombs County, Georgia (Figure 1). This bridge replacement project is a candidate for the Low Impact Bridge Program (LIBP).

Toombs 2018
11017 Perrine, Wesley A. Phase 1 Archaeological Survey of a Proposed Resurfacing Along State Route 26 in Chatham and Effingham Counties, Georgia

The proposed work will take place along a 5.53 mile section of State Route (SR) 26 in Chatham and Effingham Counties from south of CS 446/Wilkes Street to SR 17 (MP 4.494 – MP 5.344)(Figure I).

Chatham 2013
11020 Perrine, Wesley A. Phase 1 Archaeological Survey of Proposed Resurfacing Along State Route 25 in Bryan County, Georgia

The proposed work will take place along a 4.8 mile section of State Route (SR) 25 in Bryan County from 0.3 miles south of the intersection of CS 260/Ponderosa Road to the Ogeechee River (MP 4.113 - MP 8.874)(Figure 1 ).

Bryan 2013
11028 Perrine, Wesley A. Phase 1 Archaeological Survey of Proposed Resurfacing along State Route 27 in Telfair County, Georgia

The proposed work will take place along a 5.997 mile section of State Route (SR)

27 in Telfair County from the Dodge County Line and ending just south of the intersection of Spalding

Telfair 2018
11401 Perrine, Wesley A. Phase I Archaeological Survey for Bridge Maintenance Activities on State Route 12 over Snapfinger Creek in DeKalb County, Georgia

The purpose of this project is for bridge maintenance activities on Structure # 089-0016-0, State Route (SR) 12/Covington Highway over Snapfinger Creek in DeKalb County, Georgia.

DeKalb 2018
12127 Perrine, Wesley A. Phase I Archaeological Survey for Intersection Improvements at State Route 12/Covington Highway and County Road 5190/S Hairston Road, DeKalb County, Georgia

This project consists of intersection improvements at State Route (SR) 12/Covington Highway at County Road (CR) 5190/S Hairston Road.

DeKalb 2018
12238 Perrine, Wesley A. Phase I Archaeological Survey for the Replacement of Bridge 295-5068-0 over Voiles Creek for the Low Impact Bridge Program, Walker County, Georgia

The purpose of this project is to replace a structurally deficient bridge (Structure ID 295-5068-0) carrying County Road (CR) 716 (Hog Jowl Road) over Voiles Creek in Walker County, Georgia (Figure I). This bridge replacement project is a candidate for the Low Impact Bridge Program (LIBP).

Walker 2018
12425 Perrine, Wesley A. Phase I Archaeological Survey of Proposed Resurfacing along State Route 124 in DeKalb County, Georgia

The proposed work will take place along a 6.448 mile section of State Route (SR) 124 in DeKalb County from the Interstate (I-) 20 to the Gwinnett County Line (Figure 1).

DeKalb 2018
12462 Perrine, Wesley A. Phase 1 Archaeological Survey of Proposed Resurfacing along State Route 27 in Glynn County, Georgia

The proposed work will take place along a 6.893 mile section of State Route (SR) 27 in Glynn County from the south end of the Yellow Bluff Creek Bridge to the intersection of SR 25 (MP 16.177 – MP 23.070) (Figure 1).

Glynn 2018
12529 Perrine, Wesley A. Phase 1 Archaeological Survey of Proposed Railroad Crossing Improvements at Three Intersections along the Hartwell Railroad in Franklin County, Georgia

The proposed work will take place at three intersections along the Hartwell Railroad in Franklin County, Georgia (Figure 1) (Table 1).

Franklin 2018
Displaying 21 - 30 of 50